My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Demolition of Rabbi Shulman Apartments Proj No 125-014 - Pitsch Companies
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Demolition of Rabbi Shulman Apartments Proj No 125-014 - Pitsch Companies
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:33:46 PM
Creation date
9/9/2025 2:31:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P T i 1 <br />S�z.7�cs�r 1 �pEr�., �veE Qu � srr�N� re rr <br />.Demolition Engineers �u6377cc��r # y .Landfill operation <br />Asbestos Abatement Dumpster Service <br />.Salvaged Building Materials Portable Toilet Service <br />.Excavating & Underground Services , .Land Development <br />.Concrete Recycling <br />rr. <br />Companies <br />MAJOR PROJECTS COMPLETED WITHIN THE PAST 5 YEARS <br />Riverside Correctional Facilltv, , Ionia Michigan <br />Services Provided: <br />Abatement, Mass Demolition, Trucking and Removal of <br />Debris, Site Restoration <br />Owner: <br />State of Michigan <br />GC: <br />TriMedia EE <br />Project Description: <br />This project entailed the abatement and demolition of over <br />26 buildings at a former correctional facility in Ionia. We <br />installed soil erosion controls, abated asbestos containing <br />materials, demolish all of the buildings, excavated the <br />foundations, stripped all blacktop pavements, backfilled the <br />basement cavities with sand and finished the entire area with <br />topsoil and seed. <br />Final Total Project Cost: <br />$ 6,300,000 <br />Duration of Project: <br />20 months, Finished in Spring 2024 <br />Best Practices: <br />We used excavators with pulverizers to chew through the <br />concrete columns, slabs and foundations. We also used <br />excavators with shear blades to cut down the steel -framed <br />buildings and process steel members into manageable <br />lengths. Concrete was staged at a neighboring pit and <br />crushed into road gravel, some of which was reused to <br />stabilize the site. Multiple dust busters were used during <br />the demolition work to eliminate fugitive dust. <br />Team Members: Lewis Pitsch estimated and managed the project. We had <br />multiple operators on site. Joe Zahm was the lead site <br />superintendent and operated heavy equipment, <br />communicated daily with the office regarding equipment and <br />staffing needs, and was the GC's field contact. <br />Contact: Julie Tresedder, TriMedia EE (906) 228-5125 <br />% Self Performed: 80% (Abatement was subcontracted to 2 separate firms) <br />HOME OFFICE: LANDFILL OFFICE- <br />675 Richmond, N .W., Grand Rapids, MI 49504 7905 Johnson Rd., Belding, MI 48809 <br />Telephone: (616) 363-4895 Telephone: (616) 794-3050 <br />FAX: (616) 3 63-5 585 FAX: (616) 794-1769 <br />
The URL can be used to link to this page
Your browser does not support the video tag.