My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Etna
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Etna
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:35:00 PM
Creation date
9/9/2025 2:29:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
m the <br />contract wit <br />its own organiza <br />he <br />The ability or desire of a prime contractor to peter need omaketgood faith efforts touse f�'w,^�BE slug <br />team does not relieve the prime contractor Of <br />t theGontract goal. <br />contractors to meet <br />EXAMPLE 'total Project Estimate is 500,000. An r�t"�BE g <br />oal of 10% is set fora specific part of the project, i.e., <br />� r�r'Itr�tr�tt�r, end it is '�5tr,000. +� non Nt>�+F3E submits a <br />$50,000. Only one 74 WBE submits a quote to the prime <br />the requirement of making a good faith effort to meet the <br />quote of 45,00�I. Rejecting the Iv1VVBE laid may percent and dollar amount set for M BE <br />nd <br />contract goal because, 1) the MVVBE quote is �roithin the goal pet <br />guarantee <br />on the project; 2) selection of the +WBl=fquote e between theal rBE andcno @�t+ BE quote o sal a <br />not <br />participation the dr <br />that its bid will be deemed responsive; and <br />signiflcant in terms of the overall contract amount i.e., 1% of tonal contract)* <br />id is 50,1�t?t�, it may' yet not be demonstrative of a good' faith <br />If the t BE"s quote is $5 solely <br />and the non-�+t''WBE b elsewhere in the contract while <br />effort to reject the h+lyl�iCiE solely because the l 1' PB eq oteis not cted tohbelomade upe elsewhere <br />is not greatly significant <br />to the total contract cost, and it could reasonably p <br />guaranteeing full goal compliance. <br />ment as to <br />The above examples are illustrative onlym The City wall make <br />by a fair andreand taking irrtolaccougrrt the 0rual� Quanood tity, an <br />based on all information and documentation contractor or to meet the ,contract goal. <br />Intensity of the efforts made b <br />Pa�t�lic �;�'erks �Iucrre <br />
The URL can be used to link to this page
Your browser does not support the video tag.