Laserfiche WebLink
m the <br />contract wit <br />its own organiza <br />he <br />The ability or desire of a prime contractor to peter need omaketgood faith efforts touse f�'w,^�BE slug <br />team does not relieve the prime contractor Of <br />t theGontract goal. <br />contractors to meet <br />EXAMPLE 'total Project Estimate is 500,000. An r�t"�BE g <br />oal of 10% is set fora specific part of the project, i.e., <br />� r�r'Itr�tr�tt�r, end it is '�5tr,000. +� non Nt>�+F3E submits a <br />$50,000. Only one 74 WBE submits a quote to the prime <br />the requirement of making a good faith effort to meet the <br />quote of 45,00�I. Rejecting the Iv1VVBE laid may percent and dollar amount set for M BE <br />nd <br />contract goal because, 1) the MVVBE quote is �roithin the goal pet <br />guarantee <br />on the project; 2) selection of the +WBl=fquote e between theal rBE andcno @�t+ BE quote o sal a <br />not <br />participation the dr <br />that its bid will be deemed responsive; and <br />signiflcant in terms of the overall contract amount i.e., 1% of tonal contract)* <br />id is 50,1�t?t�, it may' yet not be demonstrative of a good' faith <br />If the t BE"s quote is $5 solely <br />and the non-�+t''WBE b elsewhere in the contract while <br />effort to reject the h+lyl�iCiE solely because the l 1' PB eq oteis not cted tohbelomade upe elsewhere <br />is not greatly significant <br />to the total contract cost, and it could reasonably p <br />guaranteeing full goal compliance. <br />ment as to <br />The above examples are illustrative onlym The City wall make <br />by a fair andreand taking irrtolaccougrrt the 0rual� Quanood tity, an <br />based on all information and documentation contractor or to meet the ,contract goal. <br />Intensity of the efforts made b <br />Pa�t�lic �;�'erks �Iucrre <br />