My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Etna
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Etna
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:35:00 PM
Creation date
9/9/2025 2:29:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TYPE 4G & 4F <br />INSTALLATION INSTRUCTIONS <br />PIPE INSTALLATION <br />Entrance e6opa .. f <br />Lutrcaia wnll <br />3hauVRr <br />Step o-f epipot <br />} At, -Vs apply <br />J i J♦ubflr�nt w <br />+ iOCE of ginkv <br />r.le <br />i/ No luv rn <br />Squared end of paSkCl <br />MANHOLE INSTALLATION <br />* Lubrica%wall <br />Enlranw slope <br />Always apply --------- Confined groove <br />lub"nt to - Proflo gasket <br />race ui glel <br />Type 4G and 4F gaskets manufactured by Press- <br />eal Corpora lion have proved to be one of the <br />most reliably gasket systems ever developed <br />for concrete pipe. It is easy to ensure the hest <br />perforrnance of the 43 and 4F gaskets by fallowing <br />these simple installation sleps. <br />1. The pipe should be handfed with extreme <br />caution to avold chipping of the spigots or bell <br />grooves. <br />2. Check for and remove any loose dirt, debris or <br />foreign material from the inside surface of the <br />bell, spigot and gasket. <br />3. Stretch the gasket aver the spigot end of ihP <br />pipe and move it back until it is seated against <br />the step of the spigot, Always ptaee squared <br />area of gasket against pipe and step. <br />4. The gasket should ba equalized by inserting a <br />clean round metal object between the gasket <br />and manhole and making al teas{ 1 -112 <br />revolutions around the manhole, The gasket <br />can also be equalized by slightly tugging/ <br />piriching the gasket nt different paints around <br />the manhole. <br />5. After equalization, ensure the rear of the gasket <br />is seated firmly against the spigot steer around <br />the full circumference of the spigot. <br />6. Remove ail dirt and other foreign matter from <br />the iris1de surface of the bell. Using Press -Seal <br />lubricant formulated especially la concrete <br />pipe, lubricate the enure bell area of the joint. <br />8a aura to coat the entrance slope of the bell <br />thorougInly with lubricant. It is important that the <br />gasket grips the spigot during installation, so <br />that it is not displaced from the step. <br />7. Carefully align pipe sections squarely and taring <br />home slowly, so that the gasket makes contact <br />with the bell entrance slope evenly around ilia <br />entire pipe joint. <br />S. Complete Installation by fallowing pipe <br />manufacturer's recommended bedding and <br />backfilting practices. <br />100 Press -Seal be sieves al I irdurmation is aacu rate i�s of lis pubilealim dalo_ Inrormallon, s pecifitalions, and prices <br />are all subJecl to change wlihoo notice. Press -Seal is not r$sponslWo Wong Inadverient errors- Copyrighl 2021. <br />Phone: 800-348-7325 <br />Fax: (260) 436.1908 <br />PRESS -SEAL CORPORATION <br />Prntsclin GvrPlarref ys Glean Waler Supoy <br />r5 mrr ir�gMtr+.e• Muidon94.27. 21.2 rr <br />Email; sates @press-seal.c❑m <br />Web: www.press-seal.comCS) <br />
The URL can be used to link to this page
Your browser does not support the video tag.