My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Western Avenue Transformation District Proj No 125-047 - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Western Avenue Transformation District Proj No 125-047 - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:27:17 PM
Creation date
9/9/2025 2:26:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hard Rock Casino >> Gary, IN <br />DLZ provided environmental, engineering, surveying, <br />wetland coordination, and construction field services <br />for the construction of a new Hard Rock Casino <br />in Gary, Indiana. As part of the design team, DLZ <br />provided plans to develop an approximately 50- <br />acre site with over 2,000 parking spaces located <br />immediately southwest of the 1-94/Burr Street <br />interchange. <br />DLZ developed preliminary grading plans and <br />final construction documents for the proposed <br />casino site. Specific design elements included: site <br />demolition/removals, grading, interior site access <br />roads, surface parking areas, curbing, sidewalks, <br />storm sewers, storm water basins, sanitary sewers, <br />potable water and fire protection, and coordination <br />of electrical and gas service to the proposed <br />building. DLZ also coordinated design efforts with <br />the City of Gary to obtain Site Plan Approval, as well <br />as a Storm Water Permit through the City's formal <br />approval process. <br />City of South Bend Relevant Project Experience <br />Completed <br />Beacon Memorial Parking Lot Improvements <br />(Multiple Phases) <br />East Bank Phase 4 <br />>> Olive -Sample Roundabout <br />Pinhook Park Site Improvements <br />South Bend Armed Forces Reserve Center <br />Bendix Drive Phase 1 & 2 <br />Sample Street/Sheridan Drive Intersection <br />>> Angela Boulevard Roadway Improvements <br />In Construction <br />Raclin Murphy Encore Center (Morris Performing <br />Arts Center) <br />Byers Softball Complex Improvements <br />In Design <br />Drewery's Brewery Cleanup, Phase III <br />Kennedy Park Improvements <br />UDLZ <br />City of South Bend » Western Avenue Transformation District » 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.