My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Western Avenue Transformation District Proj No 125-047 - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Western Avenue Transformation District Proj No 125-047 - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:27:17 PM
Creation date
9/9/2025 2:26:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Armed Forces Reserve Center <br />South Bend, IN <br />DLZ was commissioned by the Military Department <br />of Indiana to provide architectural and engineering <br />design services for an 80,000 S.F. Addition/ <br />Alteration project at the South Bend Armed Forces <br />Reserve Center (AFRC) for the Indiana Army <br />National Guard. The project scope of work includes <br />approximately 40,000 S.F. of renovation and <br />approximately 40,000 S.F. of new construction, <br />including a new Vehicle Maintenance Building. <br />Pinhook Park Improvements <br />South Bend, IN <br />The City desired to make park improvements utilizing <br />partial funding from a Land and Water Conservation <br />Fund (LWCF) grant. The one -mile trail and access <br />improvements focus on connectivity within the park <br />and to the nearby regional trail system, preservation <br />of existing mature tree canopy, accessibility for all <br />users, and creation of a unique user experience. The <br />playground includes nature -based themes and strives <br />to inspire exploration, physical activity, and inclusive <br />The project included a significant amount of site play. <br />development on the 25-acre site including POV <br />parking and circulation, pervious pavements, military <br />tactical vehicle storage, security fencing, Anti- <br />terrorism Force Protection (ATFP) measures, bio- <br />retention, grading and coordination of storm water <br />drainage, landscape planting, irrigation, site utilities, <br />water distribution, and power distribution. <br />South Bend Armory Success Story <br />When designing the South Bend Armory, DLZ <br />designed a heavy vehicle loading area. The parking <br />lot design included 20 inches of aggregate to <br />address the extremely heavy vehicle loads. In <br />addition, our Structural Engineers were able to <br />design loading ramps to assist in loading and <br />unloading vehicles from transport trucks. <br />The project also includes a concrete launch ramp for <br />small boats, boarding dock, accessible kayak launch, <br />and a secondary floating fishing pier. Architectural <br />improvements to the existing Pavilion include updated <br />interior finishes, electronics and lighting, accessibility <br />improvements within the existing restrooms. DLZ <br />services included programming, geotechnical <br />services, topographic survey, Section 106/NEPA <br />services, asbestos testing, 401/404 permitting, and <br />development of design and construction documents <br />along with bid and construction phase services. <br />UDLZ <br />City of South Bend » Western Avenue Transformation District » 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.