My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Western Avenue Transformation District Proj No 125-047 - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Western Avenue Transformation District Proj No 125-047 - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:27:17 PM
Creation date
9/9/2025 2:26:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t ... �. <br />an ClE <br />4W <br />Matt has availability for up to 60% of h <br />RELEVANT PROJECT EXPERIENCE <br />Indiana National Guard Center - South Bend, IN <br />» Lead Site/Civil Engineer. The project included a <br />significant amount of site development on the <br />25-acre site including POV parking and <br />circulation, military tactical vehicle storage, <br />security fencing, Anti -terrorism Force Protection <br />measures, bio-retention, grading and coordination <br />of storm water drainage, landscape planting, <br />irrigation, site utilities, and water and power <br />distribution. <br />Kennedy Park, South Bend, IN <br />» Project Manager. Responsible for Preliminary <br />Design Plans and assisting the City of South <br />Bend in the application process for an Outdoor <br />Recreation Legacy Partnership (ORLP) grant, <br />which was recieved. Design tasks included site <br />demolition, parking lot layout and design, site <br />drainage, grading, landscaping, building design, <br />and utility design including storm sewer, sanitary <br />sewer, water, and utility demolition. <br />e managing this project and the design team' <br />INDOT Pigeon Creek Welcome Center, IN <br />» Project Engineer. Responsible for design related <br />to a new Welcome Center along Interstate 69 <br />in northern Indiana. Design services including <br />parking lot layout, pavement design, site <br />drainage and stormwater management plan, <br />including storm sewer and basin design. <br />Construction phase services include site <br />observation, site visit reports, and construction <br />progress meetings. <br />Niles Avenue, Mishawaka, IN <br />» Project Manager. Design for approximately <br />1,750 feet of a roadway reconstruction and <br />sewer separation project for Niles Avenue, from <br />Lincolnway East to Mishawaka Avenue. Project <br />includes survey, drainage and roadway design, <br />tabletop intersection design, and water main <br />design. <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.