Laserfiche WebLink
• RCS Evans Site, Gagetown, M- Project <br />Facilitator, Preparation ofWork Plan and Health & <br />Safety Plan. Characterization and verification <br />sampling. Removal and disposal of28.00Otons of <br />non -hazardous soil and 2'OOOtons ofhazardous <br />soil along with building demolition. <br />° Sunrise Landfill, Pkr/nvveK Michigan - <br />Characterization and verification sampling, <br />Removal and disposal ofhazardous and non- <br />hazardous soi|unddmmsfromformer/ondUU. <br />* Buckeye Oil Field, [3/adw/n' Michigan - <br />Characterization and verification sampling, Soil <br />washing of soil, solidification and hauling of oil <br />field contaminated soils. 800kfi||and site <br />restoration. <br />° State of Michigan -/Wo/h'Site-Contract [. <br />Detroif.Wiohigon-AsbesfooAbofemenfond <br />demolition offormer foundry, Characterization <br />and verification sampling and removal Vffoundry <br />sand. Dowuteringofpits and excavations. <br />Solidification of sludge material and site <br />restoration, <br />Certifications / <br />* Building Inspector <br />° Supervision ofAsbestos Abatement <br />° Supervision ofHazardous Waste Remediofion. <br />Certificate ofCompletion & Approved Trainer <br />* Controlled Substance Abuse & Alcohol Misuse <br />Training for Transportation Supervisors <br />