Laserfiche WebLink
:■ABONMARCHE <br />CLIENT <br />City of South Bend <br />CONSTRUCTION <br />Phase I: $1.9M <br />Phase II: $2.72M <br />Phase III: $2.7M <br />HIGHLIGHTS <br />• Corridor Revitilization <br />• Sustainable Stormwater Management <br />• Complete Streets Design <br />WESTERN AVENUE STREETSCAPE <br />SOUTH BEND, INDIANA <br />Abonmarche partnered with the City of South Bend to redesign and revitalize the Western Avenue corridor, <br />balancing the needs of vehicles, bicycles, and pedestrians through a road diet, traffic -calming features, ADA <br />improvements, and enhanced streetscapes. The project included roadway reconstruction, sewer and water <br />main upgrades, permeable paver parking lanes, wider sidewalks, and new streetlights and trees to create a <br />safer, more accessible, and welcoming corridor. <br />CLIENT <br />City of South Bend <br />CONSTRUCTION <br />$2.9M <br />HIGHLIGHTS <br />• Expanded Parking & Accessibility <br />• Traffic Calming Measures <br />• Stormwater Management Analysis & Upgrades <br />• Improved Pedestrian Safety & Accessibility <br />WALL STREET IMPROVEMENTS <br />SOUTH BEND, INDIANA <br />Abonmarche delivered comprehensive roadway, parking, and pedestrian safety improvements along Wall <br />Street, while also designing the demolition and restoration of the existing pool site for future use. The project <br />featured new right-of-way, traffic calming measures, stormwater management, and environmentally sensitive <br />design in collaboration with the City of South Bend. <br />CLIENT <br />City of South Bend <br />CONSTRUCTION <br />$6.2M <br />HIGHLIGHTS <br />• Brownfield Site Redevelopment <br />• Site Planning & Building Design <br />• Sewer Separation & Utility Upgrades <br />• Sustainable Stormwater Management <br />• Permeable Paver Roadway Design <br />IGNITION PARK <br />SOUTH BEND, INDIANA <br />Abonmarche partnered with the City of South Bend and Great Lakes Capital Development to redevelop the <br />former Studebaker manufacturing site. The project included sewer separation, road reconstruction, new utilities, <br />and streetscape improvements on Franklin Street, along with site planning and design for three new light <br />industrial office buildings and a master drainage plan to support future development. <br />Proposal for City of South Bend - Western Avenue Transformation District 12 <br />