Laserfiche WebLink
DIVISION 2 - Grand Trunk Western RR Water Main Replacement at S. 30th Street / CITY OF SOUTH BEND Project #122-041 <br />Bid Tab <br />Engineer's Estimate <br />HRP <br />SELGE <br />ITEM <br />DESCRIPTION OF ITEM <br />ESTIMATED <br />QUANTITY <br />UNIT <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />1 <br />Mobilization and Demobilization <br />1 <br />LS <br />$30,000.00 <br />$30,000.00 <br />$40,000.00 <br />$40,000.00 <br />$48,000.00 <br />$48,000.00 <br />$0.00 <br />2 <br />Clearing Right of Way <br />1 <br />LS <br />$40,000.00 <br />$40,000.00 <br />$138,000.00 <br />$138,000.00 <br />$53,000.00 <br />$53,000.00 <br />$0.00 <br />3 <br />Maintenance of Traffic <br />1 <br />LS <br />$15,535.00 <br />$15,535.00 <br />$11,000.00 <br />$11,000.00 <br />$39,700.00 <br />$39,700.00 <br />$0.00 <br />4 <br />Erosion Control <br />1 <br />LS <br />$3,107.00 <br />$3,107.00 <br />$2,500.00 <br />$2,500.00 <br />$1,000.00 <br />$1,000.00 <br />$0.00 <br />5 <br />Launching and Receiving Jack and Bore Pit Excavation <br />1 <br />LS <br />$100,000.00 <br />$100,000.00 <br />$105,250.00 <br />$105,250.00 <br />$103,000.00 <br />$103,000.00 <br />$0.00 <br />6 <br />Excavation, Common <br />8 <br />CYS <br />$425.00 <br />$3,400.00 <br />$400.00 <br />$3,200.00 <br />$50.00 <br />$400.00 <br />$0.00 <br />7 <br />Structural Backfill, Type II <br />332 <br />CYS <br />$75.00 <br />$24,900.00 <br />$37.00 <br />$12,284.00 <br />$67.00 <br />$22,244.00 <br />$0.00 <br />8 <br />HMA for Patching, Full Depth, Type B <br />169 <br />TON <br />$100.00 <br />$16,900.00 <br />$133.00 <br />$22,477.00 <br />$132.00 <br />$22,308.00 <br />$0.00 <br />9 <br />HMA Surface, Type B <br />403 <br />TON <br />$55.00 <br />$22,165.00 <br />$18.00 <br />$7,254.00 <br />$16.00 <br />$6,448.00 <br />$0.00 <br />10 <br />Asphalt for Tack Coat <br />3 <br />TON <br />$100.00 <br />$300.00 <br />$68.00 <br />$204.00 <br />$67.00 <br />$201.00 <br />$0.00 <br />11 <br />Milling, Asphalt, 1.5 IN. <br />403 <br />SYS <br />$30.00 <br />$12,090.00 <br />$13.00 <br />$5,239.00 <br />$20.00 <br />$8,060.00 <br />$0.00 <br />12 <br />Subgrade Treatment, Type II <br />21 <br />SYS <br />$250.00 <br />$5,250.00 <br />$125.00 <br />$2,625.00 <br />$62.00 <br />$1,302.00 <br />$0.00 <br />13 <br />Subgrade Treatment, Type IC <br />169 <br />SYS <br />$80.00 <br />$13,520.00 <br />$148.00 <br />$25,012.00 <br />$99.00 <br />$16,731.00 <br />$0.00 <br />14 <br />PCCP for Approaches, 6 IN. <br />21 <br />SYS <br />$160.00 <br />$3,360.00 <br />$241.00 <br />$5,061.00 <br />$200.00 <br />$4,200.00 <br />$0.00 <br />15 <br />Curb, Concrete, 6 IN. <br />37 <br />LFT <br />$120.00 <br />$4,440.00 <br />$73.00 <br />$2,701.00 <br />$75.00 <br />$2,775.00 <br />$0.00 <br />16 <br />Curb, Concrete, Remove <br />37 <br />LFT <br />$20.00 <br />$740.00 <br />$12.00 <br />$444.00 <br />$5.00 <br />$185.00 <br />$0.00 <br />17 <br />Concrete, Remove <br />23 <br />SYS <br />$25.00 <br />$575.00 <br />$50.00 <br />$1,150.00 <br />$5.00 <br />$115.00 <br />$0.00 <br />18 <br />Compacted Aggregate, No. 53 <br />5 <br />TON <br />$350.00 <br />$1,750.00 <br />$318.00 <br />$1,590.00 <br />$100.00 <br />$500.00 <br />$0.00 <br />19 <br />Mulched Seeding, U <br />81 <br />SYS <br />$25.00 <br />$2,025.00 <br />$6.00 <br />$486.00 <br />$140.00 <br />$11,340.00 <br />$0.00 <br />20 <br />Topsoil, 2 IN. <br />5 <br />CYS <br />$100.00 <br />$500.00 <br />$335.00 <br />$1,675.00 <br />$100.00 <br />$500.00 <br />$0.00 <br />21 <br />Line, Thermoplastic, Solid, Yellow, 4 IN. <br />456 <br />LFT <br />$2.00 <br />$912.00 <br />$3.00 <br />$1,368.00 <br />$4.00 <br />$1,824.00 <br />$0.00 <br />22 <br />Line, Thermoplastic, Solid, White, 4 IN. <br />408 <br />LFT <br />$2.00 <br />$816.00 <br />$3.00 <br />$1,224.00 <br />$4.00 <br />$1,632.00 <br />$0.00 <br />23 <br />Transverse Marking, Thermoplastic, Stop Line, White, 24 IN. <br />92 <br />L <br />$15.00 <br />$1,380.00 <br />$15.00 <br />$1,380.00 <br />$15.00 <br />$1,380.00 <br />$0.00 <br />24 <br />Pavement Message Marking, Thermoplastic, RXR, 8 FT. <br />2 <br />EA <br />$770.001 <br />$1,540.00 <br />$1,000.00 <br />$2,000.00 <br />$1,000.00 <br />$2,000.00 <br />$0.00 <br />25 <br />Sign, Sheet, with Legend, 0.100 IN. <br />7 <br />SFT <br />$75.00 <br />$525.00 <br />$41.00 <br />$287.00 <br />$41.00 <br />$287.00 <br />$0.00 <br />26 <br />Sign Post, Type 1, Reinforced Anchor Base <br />42 <br />LFT <br />$60.00 <br />$2,520.00 <br />$23.00 <br />$966.00 <br />$23.00 <br />$966.00 <br />$0.00 <br />27 <br />Water Main, Ductile Iron, 6 IN <br />283 <br />LFT <br />$300.00 <br />$84,900.00 <br />$350.00 <br />$99,050.00 <br />$430.00 <br />$121,690.00 <br />$0.00 <br />28 <br />Pipe, Steel Casing, Jack and Bore, 12 IN <br />115 <br />LFT <br />$2,000.00 <br />$230,000.00 <br />$2,139.50 <br />$246,042.50 <br />$2,964.00 <br />$340,860.00 <br />$0.00 <br />29 <br />6 IN., 45 Degree Bend, Ductile Iron Fitting <br />8 <br />EA <br />$1,150.00 <br />$9,200.00 <br />$1,500.00 <br />$12,000.00 <br />$840.00 <br />$6,720.00 <br />$0.00 <br />30 <br />6 IN. Tee <br />1 <br />EA <br />$600.00 <br />$600.00 <br />$2,250.00 <br />$2,250.00 <br />$1,000.00 <br />$1,000.00 <br />$0.00 <br />3116 <br />IN. Cross <br />1 <br />EA <br />$800.00 <br />$800.00 <br />$3,000.00 <br />$3,000.00 <br />$1,500.00 <br />$1,500.00 <br />$0.00 <br />32 <br />6 IN. Gate Valve <br />6 <br />EA <br />$2,350.00 <br />$14,100.00 <br />$3,000.00 <br />$18,000.00 <br />$2,960.00 <br />$17,760.00 <br />$0.00 <br />33 <br />6 IN. Plug <br />4 <br />EA <br />$500.00 <br />$2,000.00 <br />$400.00 <br />$1,600.00 <br />$680.00 <br />$2,720.00 <br />$0.00 <br />34 <br />Coupler for Existing Water Main Connection <br />4 <br />EA <br />$2,150.00 <br />$8,600.00 <br />$1,500.00 <br />$6,000.00 <br />$1,300.00 <br />$5,200.00 <br />$0.00 <br />35 <br />Pipe Abandonment, Flowable Fill, Non -Removable <br />2 <br />CYS <br />$300.00 <br />$600.00 <br />$1,085.00 <br />$2,170.00 <br />$200.00 <br />$400.00 <br />$0.00 <br />36 <br />Fire Hydrant and Gate Valve Assembly, Remove <br />1 <br />EA <br />$1,500.00 <br />$1,500.00 <br />$3,750.00 <br />$3,750.00 <br />$250.00 <br />$250.00 <br />$0.00 <br />371 <br />Fire Hydrant Assembly, Type I <br />1 <br />EA <br />$7,500.00 <br />$7,500.00 <br />$8,500.00 <br />$8,500.00 <br />$10,000.00 <br />$10,000.00 <br />$0.00 <br />38 <br />Water Service Line, 1.0 IN. <br />41 <br />LFT <br />$150.00 <br />$6,150.00 <br />$86.00 <br />$3,526.00 <br />$115.00 <br />$4,715.00 <br />$0.00 <br />39 <br />Water Service Line, Remove <br />38 <br />LFT <br />$150.00 <br />$5,700.00 <br />$13.00 <br />$494.00 <br />$5.00 <br />$190.00 <br />$0.00 <br />40 <br />Inspection Hole, 3FT Deep or Less <br />5 <br />EA <br />$750.001 <br />$3,750.00 <br />$2,500.00 <br />$12,500.00 <br />$600.00 <br />$3,000.00 <br />$0.00 <br />41 <br />Inspection Hole, Deeper Than 3 Ft <br />5 <br />EA <br />$900.001 <br />$4,500.00 <br />$4,500.00 <br />$22,500.00 <br />$1,100.00 <br />$5,500.00 <br />$0.00 <br />TOTAL BID (Items 1 to 41) <br />$688,150.00 <br />$836,759.50 <br />$871,603.00 <br />$0.00 <br />NOTE: BIDDER HRP BID FOR 24 INCH PIPE, STEEL CASING, JACK AND BORE INSTEAD OF 12 INCH PIPE SPECIFIED IN BID ITEM 28 <br />Certified 7/23/2025 <br />Nitin V. Timble PE, LS Date <br />No. <br />o <br />10707587 .� <br />STATE OF <br />