My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Award - Grand Trunk Western Water Main Replacement Proj #122-041 - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Bids
>
Bid Award - Grand Trunk Western Water Main Replacement Proj #122-041 - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 10:43:18 AM
Creation date
9/9/2025 10:41:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Document A31 O TM - 2010 <br />Conforms with The American institute of Architects AiA Document 34.0 <br />Bid Bond <br />CONTRACTOR: <br />(Nam, legal slotus and address] <br />HRP Construction Inc. <br />PO Box 266, 5777 Cleveland Rd <br />South Bend, IN 46624-0266 <br />OWNER: <br />(Nana, legalstartrsandrtald►rw) <br />SURETY: <br />(Name, legal status and Princtlretl place qfhWite.wj <br />Fidelity and Deposit Company of Maryland <br />1299 Zurich Way, 10th Floor <br />Schaumburg, IL 60196-1056 <br />Mailing Address for Notices <br />City of South Bend Board of Public Works <br />County -City Building Room 1316, 227 West Jefferson Blvd <br />South Bend, IN 46601 <br />BOND AMOUNT: 5% Five Percent of Amount Bid <br />This document has Important <br />legal consequence& Consultation <br />with an attorney is encouraged <br />with respect to Its `eontpletionor' <br />modification. <br />Any singular reference to <br />Contractor, Surety, Owner or <br />other patty shall be considered <br />plural where applicable, <br />PROJECT: <br />(Xmw, lortrtiwrorad&= a►►dilroject►►tuuber, (fmt <br />Grand Trunk Western Railroad Water Main Replacement At Greenlawn Avenue (Division 1) and S. 30th Street <br />(Division 2), Project No. 122-041 <br />The Contractor and Surety are bound to the Owner In the mount set forth above. for the payment of which the Contractor and Surety bind <br />themselves. their hairs, oxcoutorr, administrators, sttcxessors and as6gns, jointly and severally, as provided herein. Tho conditions of this <br />Bond am such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or withinIsuch lime period <br />as may be agreed to by the Owner and Contraclor, and the Contractor either(l) enters into a contract wiith the Otvnor in accordance «tith <br />the terms of such bid, and gives such bond or bonds as may be specified in the bidding orContract Vocuments, with a surety admitted in <br />the jurisdiction of the %ject and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt <br />payment of tabor and material furnished in the prosecution thereof; or (2)_pays to the Owner the diffomnce, not to exceed the amount of <br />this Bond, between tile amount specified in said bid and such larger amount for which the Owner may in good With contractwith another <br />party to perform lilt lion- fx)%,cmd by said bid, then this obligation shall be null and void, otherwise to remain in full rome and allect. The <br />Surety hereby,wah," any noticeofan agreement between lheOwncrand Contractor to extend the time in which the Ownermayaccept the <br />bid. Waiver ofnotice by thoSurety shall not apply to any es ten.,don exceeding-4xty(60) i vs in the aggregate beyond the time for <br />acceptance of bids specified in the bid documentx, and the Ow %or and CAmituclor %hull obtain the Sutvty'ss consent l'nran extension beyond <br />r.7xty (60) da". . <br />If this Bond isissuod in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be doomed to be <br />Subcontractor and the term Owner shall be deemed to be Contractor. <br />When this Bond has beenturnisheei to cesmply with a -statutory orolher legal requirement in the location (if lilt Project, any provision in <br />this Bondconllicting with said:sdatutory or legal requirement shall be deemed deleted iterefrorrt and pruvisionsconforming to:sttch <br />statutory or othertogal requirement shall be deemed incorporatedberein. When so furnished, the intent is that titisr iiond shall be construed <br />am u .%Wutory bond and nest as a common law band.; <br />Signed and scaled this 16th day of July, 2025. <br />(lYit►sJ Nan y Knap�ce President._ . <br />roll <br />' =ff*i= • • <br />HRP Construction Inc. <br />lPrfir �� t ` . rSral� <br />BVNI— <br />Orle} Matthew D. Cain, President <br />Fidelity and Deposit Company of Maryland <br />M <br />GOt}'r{+Gfn <br />rf�f�+ittrf� ail{++t++`� <br />"0841AS $110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.