Laserfiche WebLink
IdDLZ <br />ENGINEERS • ARCHITECTS • SC�NTISTS <br />PLANNERS • SURVEYORS <br />April 26, 2013 <br />Mr. Michael C. Mecham, P.E. <br />City Engineer <br />City of South Bend <br />County -City Building <br />227 West Jefferson Boulevard <br />South Bend, IN 46601 <br />Re: Supplemental Agreement No. 3 <br />Michigan Street, S -Curve Removal <br />DLZ Account No. 0761 - 2689 -90 <br />Dear Mr. Mecham: <br />Please fmd enclosed three copies of Supplemental Agreement No. 3 for the above - mentioned project. <br />Based on the coordination with the City and Memorial Hospital, changes to the design have been <br />directed, and we are, therefore, requesting your consideration of the following revisions to the <br />Agreement: <br />1. The following items have been added as described in the agreement: <br />• Additional following options for the revised layout were evaluated: <br />1. Option # 1 — The revised layout with the option of using pervious concrete along with <br />concrete. <br />2. Option # 2 — Mill & Overlay the whole layout. <br />3. Option # 3 —Reconstructing the whole lot with asphalt. <br />4. Option # 4 —Reconstructing the whole lot with concrete. <br />The final design will be based on Option # 3 with Option # 4 being an additional bid alternate. <br />• Demolition of two existing buildings. <br />• Additional parking area under the building for Bid Package # 3A. <br />• Reconfiguration of parking lot layout per Figure 6. <br />2. Exhibit 2, updating the hourly rates of the Contract for 2013 rate schedule. <br />2211 East Jefferson Blvd. • South Bend, Indiana 46615 • (574) 236 -4400 • FAX (574) 236 -4471 <br />With Offices Throughout The Midwest <br />www.dlz.com <br />