£rv+ir
<br />rt�T�1a
<br />4 \'4
<br />a.
<br />Field Survey (Including
<br />Route Survey Plat )
<br />$73,000.00
<br />$10,000.00
<br />$18,700.00
<br />$0.00
<br />$101,700.00
<br />b 1.
<br />Preliminary Roadway Design
<br />and Plans 20% Complete)
<br />$82,000.00
<br />- $28,700.00
<br />$0.00
<br />$0.00
<br />$53,300.00
<br />b 2.
<br />Bid Package 1
<br />$0.00
<br />$202,000.00
<br />$0.00
<br />$0.00
<br />$202,000.00
<br />C.
<br />Maintenance of Traffic
<br />Concepts
<br />$8,000.00
<br />- $4,000.00
<br />$0.00
<br />$0.00
<br />$4,000.00
<br />d.
<br />Public Information Meeting,
<br />Hourly Rate, as required
<br />$6,000.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$6,000.00
<br />e.
<br />Conceptual Traffic Signal
<br />Design
<br />$20,500.00
<br />- $8,200.00
<br />$0.00
<br />$0.00
<br />$12,300.00
<br />f.
<br />Utility Coordination, Houdy
<br />Rate, as required
<br />$8,000.00
<br />$2,000.00
<br />$5,000.00
<br />$0.00
<br />$15,000.00
<br />9.
<br />Coordination with Memorial
<br />Hospital and INDOT, Hourly
<br />Rate, as required
<br />$10,000.00
<br />1 $2,500.00
<br />$2,500.00
<br />$0.00
<br />1 $15,000.00
<br />h.
<br />RW Engineering (4 Parcels
<br />@$2,700 per Parcel), if
<br />required
<br />$27,000.00
<br />- $10,800.00
<br />- $5,400.00
<br />$0.00
<br />$10,800.00
<br />L
<br />Title Abstracting (4 Parcels
<br />@ $325 per Parcel), if
<br />required*
<br />$3,250.00
<br />- $1,300.00
<br />0.00
<br />0.00
<br />$1,950.00
<br />J.
<br />Geotechnical Evaluation
<br />$7,500.00
<br />$0.00
<br />$15,000.00
<br />$0.00
<br />$22,500.00
<br />k.
<br />Bid Package 2
<br />$0.00
<br />$48,000.00
<br />$0.00
<br />$0.00
<br />$48,000.00
<br />L I
<br />Bid Package 3
<br />$0.001
<br />$0.00
<br />$130,000.00 1
<br />$30,000.00
<br />$160,000.00
<br />M.
<br />Bid Package 4
<br />$0.00 1
<br />$0.00
<br />$90,000.00
<br />$0.00
<br />$90,000.00
<br />n 1.
<br />Subsurface Utility
<br />Engineering SUE Area 1
<br />$0.00
<br />$0.00
<br />$11,360.00
<br />$0.00
<br />$11,360.00
<br />n 2.
<br />Subsurface Utility
<br />Engineering SUE Area 2
<br />$0.00
<br />$0.00
<br />$11,360.00
<br />$0.00
<br />$11,360.00
<br />n 3.
<br />Subsurface Utility
<br />Engineering SUE Area 3
<br />$0.00
<br />$0.00
<br />$24,180.00
<br />$0.00 1
<br />$24,180.00
<br />o.
<br />RI ht of Way Dedication Plat
<br />$0.00
<br />$0.00
<br />$10,000.00
<br />$0.00
<br />$10,000.00
<br />A
<br />Bid Phase, Pre
<br />Construction Meeting and
<br />Construction Phase Office
<br />Services, Hourly Rate, as
<br />required
<br />$0.001
<br />$0.00
<br />$8,000.00
<br />$6,000.00
<br />$14,000.00
<br />q.
<br />Building Demolition
<br />Services
<br />$0.00
<br />$0.00
<br />$0.00
<br />$10,500.00
<br />$10,500.00
<br />IX. Add Sections A.28 - A.31 to Appendix "E" as follows:
<br />28. Any services required or associated with anticipated unforeseen
<br />issues, including but not limited to, demolition and
<br />environmentaUabatement issues. It is anticipated that un- identified
<br />structures, contaminated soils, or other related items maybe
<br />uncovered or exposed as pan` of the demolition activities. It is also
<br />7of10
<br />Supplemental Agreement No. 3
<br />
|