Laserfiche WebLink
£rv+ir <br />rt�T�1a <br />4 \'4 <br />a. <br />Field Survey (Including <br />Route Survey Plat ) <br />$73,000.00 <br />$10,000.00 <br />$18,700.00 <br />$0.00 <br />$101,700.00 <br />b 1. <br />Preliminary Roadway Design <br />and Plans 20% Complete) <br />$82,000.00 <br />- $28,700.00 <br />$0.00 <br />$0.00 <br />$53,300.00 <br />b 2. <br />Bid Package 1 <br />$0.00 <br />$202,000.00 <br />$0.00 <br />$0.00 <br />$202,000.00 <br />C. <br />Maintenance of Traffic <br />Concepts <br />$8,000.00 <br />- $4,000.00 <br />$0.00 <br />$0.00 <br />$4,000.00 <br />d. <br />Public Information Meeting, <br />Hourly Rate, as required <br />$6,000.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$6,000.00 <br />e. <br />Conceptual Traffic Signal <br />Design <br />$20,500.00 <br />- $8,200.00 <br />$0.00 <br />$0.00 <br />$12,300.00 <br />f. <br />Utility Coordination, Houdy <br />Rate, as required <br />$8,000.00 <br />$2,000.00 <br />$5,000.00 <br />$0.00 <br />$15,000.00 <br />9. <br />Coordination with Memorial <br />Hospital and INDOT, Hourly <br />Rate, as required <br />$10,000.00 <br />1 $2,500.00 <br />$2,500.00 <br />$0.00 <br />1 $15,000.00 <br />h. <br />RW Engineering (4 Parcels <br />@$2,700 per Parcel), if <br />required <br />$27,000.00 <br />- $10,800.00 <br />- $5,400.00 <br />$0.00 <br />$10,800.00 <br />L <br />Title Abstracting (4 Parcels <br />@ $325 per Parcel), if <br />required* <br />$3,250.00 <br />- $1,300.00 <br />0.00 <br />0.00 <br />$1,950.00 <br />J. <br />Geotechnical Evaluation <br />$7,500.00 <br />$0.00 <br />$15,000.00 <br />$0.00 <br />$22,500.00 <br />k. <br />Bid Package 2 <br />$0.00 <br />$48,000.00 <br />$0.00 <br />$0.00 <br />$48,000.00 <br />L I <br />Bid Package 3 <br />$0.001 <br />$0.00 <br />$130,000.00 1 <br />$30,000.00 <br />$160,000.00 <br />M. <br />Bid Package 4 <br />$0.00 1 <br />$0.00 <br />$90,000.00 <br />$0.00 <br />$90,000.00 <br />n 1. <br />Subsurface Utility <br />Engineering SUE Area 1 <br />$0.00 <br />$0.00 <br />$11,360.00 <br />$0.00 <br />$11,360.00 <br />n 2. <br />Subsurface Utility <br />Engineering SUE Area 2 <br />$0.00 <br />$0.00 <br />$11,360.00 <br />$0.00 <br />$11,360.00 <br />n 3. <br />Subsurface Utility <br />Engineering SUE Area 3 <br />$0.00 <br />$0.00 <br />$24,180.00 <br />$0.00 1 <br />$24,180.00 <br />o. <br />RI ht of Way Dedication Plat <br />$0.00 <br />$0.00 <br />$10,000.00 <br />$0.00 <br />$10,000.00 <br />A <br />Bid Phase, Pre <br />Construction Meeting and <br />Construction Phase Office <br />Services, Hourly Rate, as <br />required <br />$0.001 <br />$0.00 <br />$8,000.00 <br />$6,000.00 <br />$14,000.00 <br />q. <br />Building Demolition <br />Services <br />$0.00 <br />$0.00 <br />$0.00 <br />$10,500.00 <br />$10,500.00 <br />IX. Add Sections A.28 - A.31 to Appendix "E" as follows: <br />28. Any services required or associated with anticipated unforeseen <br />issues, including but not limited to, demolition and <br />environmentaUabatement issues. It is anticipated that un- identified <br />structures, contaminated soils, or other related items maybe <br />uncovered or exposed as pan` of the demolition activities. It is also <br />7of10 <br />Supplemental Agreement No. 3 <br />