My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Traffic Signal central management Proj No 125-051 - DLZ
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Traffic Signal central management Proj No 125-051 - DLZ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:48:37 PM
Creation date
8/26/2025 12:48:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Traffic Signal Optimization <br />and Cabinet Replacement <br />Assessment I Schaumburg, IL <br />Iteris completed a traffic signal optimization <br />project for the Meacham Road corridor <br />between Higgins Road and Algonquin Road in <br />Schaumburg, IL. As one of the village's most <br />heavily used corridors, Iteris evaluated and <br />implemented a comprehensive update to the <br />operational parameters of the traffic signal <br />system along the corridor in order to optimize <br />its operations and improve traffic flow to and <br />from the Greater Woodfield Area. In addition to <br />the signal optimization study, Iteris completed <br />a thorough assessment and inventory of the <br />existing traffic signal cabinets, controllers, and <br />equipment to develop a replacement plan. <br />Iteris continues to provide on -demand traffic <br />engineering services under a separate effort. <br />City of Joliet, IL <br />Iteris is responsible to conduct a centralized traffic management system (CTMS) <br />study for 130 key signalized intersections, providing services that include <br />master plan development for the new CTMS, including field data collection and <br />inventory, project development, stakeholder outreach, software procurement, <br />detailed design of Phase A, and assistance with the bid process and construction <br />engineering. Iteris subsequently provided design services for Phase B and C of the <br />rollout, and led a successful pursuit of CMAQ funding for Phase <br />City of South Bend I Traffic Signal Central Management System 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.