My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Traffic Signal central management Proj No 125-051 - DLZ
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Traffic Signal central management Proj No 125-051 - DLZ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:48:37 PM
Creation date
8/26/2025 12:48:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT MANAGER 4 <br />ANTHONY GLENN, PE <br />18 Years Experience <br />BS Civil Engineering, Registrations: IN <br />Valparaiso University <br />DEPUTY <br />PROJECT MANAGER/ <br />ITS LEAD <br />DANIEL WIKTORZAK, PE <br />23 Years Experience <br />Anthony has extensive experience with the City of South Bend, <br />and in delivering multiple LPA projects through the INDOT project <br />development process. With 18 years of experience, Anthony has <br />managed a variety of transportation projects, including traffic <br />analysis, feasibility studies, road design, and preparation of <br />construction documents. <br />Anthony's desire to solve problems led him to pursue a career <br />in engineering. Over time, his passion has grown beyond the <br />technical aspects of the work —he is driven to become a true <br />partner to his clients, working as an extension of their team to <br />deliver projects that serve the greater community. <br />He takes pride in keeping all stakeholders informed and <br />understands the importance of identifying both the benefits <br />and risks of a project early. Anthony believes it's far better to <br />make difficult decisions at the beginning of a project than to <br />be surprised by them later. He has developed a reputation as a <br />project manager who not only delivers on schedule and within <br />budget but also takes ownership and pride in every project — <br />earning the trust of his clients along the way. <br />Dan's primary focus is ITS and traffic signal design, additionally <br />his experience covers roadway design, utility design, drainage <br />design, erosion control, site plans, and signage and striping <br />plans. <br />In addition to the DOT signal and ITS experience, Dan has been <br />consistently selected to prepare Central Signal System expansion <br />plans for Lake and DuPage Counties both of which have the most <br />robust Centracs systems in Illinois. The Lake County PASSAGE <br />system has grown to over 600 signals and DuPage network has <br />grown to over 350 connected signal along with connections to <br />the IL Tollway and a few municipalities. The success of these <br />projects can be attributed to preparation of quality contract <br />documents by our staff as well as having a dedicated Deputy <br />Project Manager who is easy to communicate with, understands <br />the challenges that agencies face and is willing to listen and offer <br />Anthony's Recent Relevant Experience <br />» Bendix Drive Road Reconstruction, South Bend, IN <br />• Bendix Drive Road Diet, South Bend, IN <br />• Kennedy Academy Safe Routes to School, South Bend, IN <br />• Colfax Avenue Two -Way Conversion, South Bend, IN <br />• Oakland Avenue, Projects A, B, & D, Elkhart, IN <br />solutions. Mr. Wiktorzak has worked with network integrators <br />such as Parsons Co. as well as traffic signal vendors in the <br />region for over a decade and provided review and input for <br />network design, fiber splicing diagrams and cabinet detail <br />plans, as well as recommendations for implementation of new <br />equipment and technologies. <br />Dan's Recent Relevant Experience <br />» DuDOT Central Signal System 14, DuPage County, IL <br />» LCDOT PASSAGE Field Elements, Lake County, IL <br />» IDOT District -Wide Traffic Signal Design, IDOT District 1 <br />» I-96 at Grand River Ave Diverging Diamond Interchange, <br />Brighton, MI <br />» Kalamazoo Central Signal System Expansion, Kalamazoo, MI <br />
The URL can be used to link to this page
Your browser does not support the video tag.