My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Traffic Signal central management Proj No 125-051 - DLZ
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Traffic Signal central management Proj No 125-051 - DLZ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:48:37 PM
Creation date
8/26/2025 12:48:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />Traffic Signal System Upgrade - Madison Avenue Corridor I Indianapolis, IN <br />DLZ was retained by the City of Indianapolis (City) to design a traffic signal interconnect plans for Madison and <br />Meridian corridors comprising of a total of 24 intersections. However, due to right of way issues and funding <br />constraints, the Meridian Avenue corridor was removed from the construction documents. <br />Due to the Federal CMAQ funding, the project's intent was to reduce emissions and delays and improved <br />traffic progression through the Madison Avenue corridor from Sumner Avenue to Stop 12 Road. <br />As a part of this design, DLZ developed traffic signal design plans for 14 intersections along Madison Avenue <br />corridor and 2 along Stop 11 corridor. The signal system was upgraded utilizing Intuicom Broadband Wireless <br />Interconnect. Significant coordination was involved include with the broadband vendor along with the site <br />survey for checking the wireless signal strength along the corridor. <br />Since the project involved Federal Funding, environmental document, Level 1 CE, was also prepared and <br />approved by INDOT. Due to limited project budget and tight schedule, the project had to be designed within <br />the existing right of way limits. <br />i� <br />WDLZ City of South Bend I Traffic Signal Central Management System 110 <br />9 <br />1f <br />
The URL can be used to link to this page
Your browser does not support the video tag.