Laserfiche WebLink
i <br />Traffic Signal System Upgrade - Madison Avenue Corridor I Indianapolis, IN <br />DLZ was retained by the City of Indianapolis (City) to design a traffic signal interconnect plans for Madison and <br />Meridian corridors comprising of a total of 24 intersections. However, due to right of way issues and funding <br />constraints, the Meridian Avenue corridor was removed from the construction documents. <br />Due to the Federal CMAQ funding, the project's intent was to reduce emissions and delays and improved <br />traffic progression through the Madison Avenue corridor from Sumner Avenue to Stop 12 Road. <br />As a part of this design, DLZ developed traffic signal design plans for 14 intersections along Madison Avenue <br />corridor and 2 along Stop 11 corridor. The signal system was upgraded utilizing Intuicom Broadband Wireless <br />Interconnect. Significant coordination was involved include with the broadband vendor along with the site <br />survey for checking the wireless signal strength along the corridor. <br />Since the project involved Federal Funding, environmental document, Level 1 CE, was also prepared and <br />approved by INDOT. Due to limited project budget and tight schedule, the project had to be designed within <br />the existing right of way limits. <br />i� <br />WDLZ City of South Bend I Traffic Signal Central Management System 110 <br />9 <br />1f <br />