My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Monroe Street Arts Building Proj No 125-021AR- Wolf Commercial Roofing
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - Monroe Street Arts Building Proj No 125-021AR- Wolf Commercial Roofing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:47:33 PM
Creation date
8/26/2025 12:46:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
August 18, 2025 <br />Zach Hurst, P.E. <br />Senior Project Engineer <br />City of South Bend, Indiana <br />Monroe Street Arts Building — Roof Replacement Quotes <br />RFI Received 8/14/2025 <br />Project No.: 125-021 AR <br />QUESTION: The new specs. Call out TPO .045 mil minimum, this is not manufactured by the listed acceptable <br />manufacturers. <br />ANSWER: Provide minimum 0.060 mil TPO membrane <br />2. QUESTION: A 20-year NDL warranty is not available on a .045 mil membrane by these manufacturers. <br />ANSWER: Provide minimum 0.060 mil TPO membrane with 20-year NDL warranty. <br />3. QUESTION: 3.5" of poly-iso is needed to create Indiana's code of R-20. The new specs are calling out 2 layers <br />of 1.5"; this only creates an R-17.4. <br />ANSWER: Provide two layers of polyiso insulation. First layer at roof deck shall be minimum 2 inches <br />thick. Top layer shall be minimum 1'/2 inches thick, tapered as required to provide drainage shown on the <br />roof plan. <br />4. QUESTION: Is the coverboard required in the field of the roof, or only at parapet walls as shown in the detail <br />drawings? <br />ANSWER: Coverboard is not required in the field of the roof. Provide coverboard at parapet walls as <br />noted in the drawing details. <br />5. QUESTION: The vapor barrier is shown on top of the insulation in detail 1- A5 01. Should it be installed on the <br />deck? <br />ANSWER: Provide vapor barrier on the top of the roof deck below the insulation. <br />No other questions have been received to date. <br />Sincerely, <br />William "Chip" Coleman <br />Senior Project Architect <br />Arkos Design 1 l 7 Lincolnway West — Mishawaka, IN 46544 574.257.0000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.