FIRM BACKGROUND/TEAM/EXPERIENCE <br />Firm Experience <br />In the last five (5) years, Garmong has completed dozens of CMc projects for public entities in the State of Indiana. Several of <br />these projects are described below. <br />Toyota Indiana YMCA of Gibson County Princeton, IN <br />Garmong served as Construction Manager for the remodel of a 60,000-square- <br />foot building. This remodel included new additions of an entryway, aquatic facility, <br />auxiliary gymnasium, locker rooms, offices, a STEM lab, a teaching kitchen, and <br />community spaces, among other amenities. This project was completed in 2025. <br />Project Cost: $19M <br />Challenges & Successes: As a renovation project, there were many unknowns <br />regarding the state of the building. To successfully navigate this challenge, the <br />Garmong team performed extensive diagnostics to determine the current state of <br />the building in order to minimize unexpected site and building conditions. <br />Reference: Johnathan Pope 812.459.7219 <br />Deaconess Aquatic Center Evansville, IN <br />Garmong served as Construction Manager for the 75,000-square-foot Deaconess <br />Aquatic Center. The center is located on the north side of Evansville's downtown in <br />Garvin Park, next to the historic Bosse Field. It houses a stretch 50-meter, Olympic - <br />sized competition pool, a leisure pool, an outdoor spray park, men's and women's <br />locker rooms, and a 1,100-square-foot meeting room. This project was completed <br />in 2021. <br />Project Cost: $28M <br />Challenges & Successes: Utilizing a Stretch 50 design where the lap lanes and <br />diving well coexist created design and construction efficiencies for this project. <br />Reference: Lloyd Winnecke 812.423.2020 <br />Martin Luther King Jr. Dream Center South Bend, IN <br />Garmong Construction served as Construction Manager for the new MLK Dream <br />Center which includes a community center and park. The building is approximately <br />42,000-square-feet and included a community meeting space, indoor playground, <br />administrative offices, computer room, and gym. This project was completed in 2025. <br />Project Cost: $24M <br />Challenges & Successes: As the first CMc project for the City of South Bend, <br />Garmong took extra care when it came to involvement with the City and answering <br />questions regarding the delivery process. <br />Reference: Eric Horvath 574.233.0311 <br />h <br />GARMONG <br />Kennedy Park Renovation I <br />Garmong Construction <br />