My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Kennedy Park Rehabiliation CMc Proj No 125-037 - Garmong
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Kennedy Park Rehabiliation CMc Proj No 125-037 - Garmong
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:44:38 PM
Creation date
8/26/2025 12:44:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Summary of Compensation Expectations & Cost Structure <br />Garmong is committed to delivering the Kennedy Park Aquatics and Recreation Project within the City's established maximum <br />budget of $13 million, inclusive of all construction and CMc services. Below is a breakdown of our compensation expectations <br />and cost structure: <br />1. Preconstruction Services (Engagement at 60% <br />Design) <br />Fixed Cost: $10,000 <br />Includes: <br />Constructability reviews <br />Value engineering recommendations <br />Cost estimating and budget validation <br />Phasing and logistics planning <br />Bid package development and public bidding <br />Schedule development and refinement <br />GMP Development <br />2. CMc Fee <br />Expected Fee: 3.25% of the cost of construction <br />Includes: <br />CMc overhead and profit <br />Executive oversight <br />3. Owner -Responsible Costs <br />These are costs outside the CMc scope and typically <br />managed directly by the Owner. They may include: <br />Design and engineering fees (DLZ) <br />Permitting and utility tap fees <br />Legal and administrative costs <br />Furniture, fixtures, and equipment (FF&E) <br />Owner contingency <br />1h <br />GARMONG <br />4. General Conditions (assuming a 12 month <br />construction schedule) <br />Estimated Range: 4%-6% <br />Includes: <br />On -site supervision, project management and project <br />engineer <br />Temporary utilities and site security <br />Sanitary Facilities/Portable Toilets <br />Safety program implementation <br />Temporary traffic barriers <br />Job site trailers and equipment <br />Temporary fencing <br />Temporary project signage <br />Technology and communication systems <br />Daily cleanup and waste management <br />Transportation and Travel <br />Insurance and bonding <br />Kennedy Park Renovation I A <br />4 Garmong Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.