My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 10 to PSA - Seitz South Riverwalk Phase 2 Proj No 125-041 - SmithGroup
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 10 to PSA - Seitz South Riverwalk Phase 2 Proj No 125-041 - SmithGroup
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 10:40:16 AM
Creation date
8/26/2025 10:40:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in and <br />part of the Agreement between Owner and Engineer for <br />Professional Services dated Dec 12, 2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 10 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: Dec 12, 2017 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: SmithGroup Inc. (Formerly SmithGroupJJR Inc.) <br />d. Project: Seitz Park Reconstruction, South Bend Project No. 117-093 <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) The scope of services is for updating and finalizing Phase II construction bid <br />documents (drawings and specifications) (Task 5) based on a bid date of October 24, <br />2025 (documents completion), permitting, and bid and award services. <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />1) N/A. <br />c. For the Additional Services or the modifications to services set forth above, Owner shall <br />pay Engineer the following additional or modified compensation on an hourly not -to - <br />exceed basis: <br />1) Task 5: Geotechnical Engineering Consultation (Phase II) — Fifteen Thousand Zero <br />Dollars. ($15,000.00). <br />d. The schedule for rendering services is modified as follows: <br />1) Extends Phase II completion date to November 28, 2025 (at conclusion of Bid and <br />Award services) as previously approved in Amendment No. 9. <br />5. Agreement Summary (Reference only) <br />a. Original Agreement amount: $ 186,400 <br />b. Net change for prior amendments: $ 1,434,195 <br />c. This amendment amount (hourly): $ 15,000 <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.