Laserfiche WebLink
WALKER FIELD - FINAL COMPARISON OF ESTIMATES <br />No. ITEMS <br />Over/ <br />Quantity Placed Under UNIT UNIT PRICE APPLICATION TOTAL EXTENSION <br />29 <br />FIELD OFFICE, TYPE C <br />6 <br />0 <br />-6 <br />MOS <br />$7,918.18 <br />$0.00 <br />($47,509.08) <br />8 <br />BORROW <br />598 <br />155.78 <br />-442.22 <br />CYS <br />$72.48 <br />$11,290.93 <br />($32,052.11) <br />25 <br />CURB AND GUTTER, COMBINED <br />1421 <br />1002 <br />-419 <br />LFT <br />$30.09 <br />$30,150.18 <br />($12,607.71) <br />37 <br />INLET, TYPE M10 <br />6 <br />4 <br />-2 <br />EACH <br />$4,956.62 <br />$19,826.48 <br />($9,913.24) <br />30 <br />PIPE, TYPE 2, CIRCULAR, DIAMETER 12 IN. <br />563 <br />467 <br />-96 <br />LFT <br />$102.80 <br />$48,007.60 <br />($9,868.80) <br />31 <br />HMA FOR STRUCTURE INSTALLATION, TYPE B <br />86 <br />50 <br />-36 <br />TON <br />$174.57 <br />$8,728.50 <br />($6,284.52) <br />21 <br />SIDEWALK, CONCRETE <br />1495 <br />1400.44 <br />-94.56 <br />SYS <br />$63.78 <br />$89,320.06 <br />($6,031.04) <br />26 <br />HMA FOR APPROACHES, TYPE B <br />18 <br />0 <br />-18 <br />TON <br />$259.52 <br />$0.00 <br />($4,671.36) <br />3 <br />PAVEMENT REMOVAL <br />1545 <br />1435 <br />-110 <br />SYS <br />$33.24 <br />$47,699.40 <br />($3,656.40) <br />47 <br />TRANSV THERMOPLASTIC XHATCH LINE, WHITE, 12" <br />450 <br />117 <br />-333 <br />LFT <br />$10.00 <br />$1,170.00 <br />($3,330.00) <br />19 <br />HMA WEDGE AND LEVEL, TYPE B <br />19 <br />12 <br />-7 <br />TON <br />$414.89 <br />$4,978.68 <br />($2,904.23) <br />33 <br />GEOTEXTILE FOR PIPE TYPE 2B <br />644 <br />0 <br />-644 <br />SYS <br />$3.68 <br />$0.00 <br />($2,369.92) <br />17 <br />JOINTADHESIVE, SURFACE <br />2136 <br />0 <br />-2136 <br />LFT <br />$0.78 <br />$0.00 <br />($1,666.08) <br />45 <br />LINE, THERMOPLASTIC, SOLID, WHITE, 6 IN. <br />1457 <br />1171 <br />-286 <br />LFT <br />$2.50 <br />$2,927.50 <br />($715.00) <br />18 <br />LIQUID ASPHALT SEALANT <br />2136 <br />0 <br />-2136 <br />LFT <br />$0.30 <br />$0.00 <br />($640.80) <br />32 <br />VIDEO INSPECTION FOR PIPE <br />563 <br />440.63 <br />-122.37 <br />LFT <br />$4.45 <br />$1,960.80 <br />($544.55) <br />42 <br />TRANSV THERMOPLASTIC XWALK LINE, WHITE, 24" <br />250 <br />216 <br />-34 <br />LFT <br />$15.00 <br />$3,240.00 <br />($510.00) <br />4 <br />CURB, CONCRETE, REMOVE <br />1648 <br />1638 <br />-10 <br />LFT <br />$19.91 <br />$32,612.58 <br />($199.10) <br />16 <br />QC/QA-HMA, 3, 58H, SURFACE, 9.5 mm <br />173 <br />171.6 <br />-1.4 <br />TON <br />$136.41 <br />$23,407.96 <br />($190.97) <br />44 <br />LINE, THERMOPLASTIC, SOLID, WHITE, 24 IN. <br />108 <br />98 <br />-10 <br />LFT <br />$15.00 <br />$1,470.00 <br />($150.00) <br />20 <br />ASPHALT FOR TACK COAT <br />1 <br />1.26 <br />0.26 <br />TON <br />$719.17 <br />$906.15 <br />$186.98 <br />49 <br />TREE PROTECTION <br />984 <br />1045 <br />61 <br />LFT <br />$6.32 <br />$6,604.40 <br />$385.52 <br />23 <br />DETECTABLE WARNING SURFACES <br />22 <br />24.3 <br />2.3 <br />SYS <br />$172.88 <br />$4,200.98 <br />$397.62 <br />28 <br />SODDING, NURSERY <br />3167 <br />3212 <br />45 <br />SYS <br />$11.93 <br />$38,319.16 <br />$536.85 <br />65 <br />CO3 - Speed Bump Signs <br />0 <br />4 <br />4 <br />0 <br />$374.00 <br />$1,496.00 <br />$1,496.00 <br />12 <br />COMPACTED AGGREGATE, NO.53 <br />84 <br />101.77 <br />17.77 <br />CYS <br />$138.40 <br />$14,084.97 <br />$2,459.37 <br />63 <br />C01- Message Boards <br />0 <br />1 <br />1 <br />LSM <br />$2,500.00 <br />$2,500.00 <br />$2,500.00 <br />46 <br />LINE, THERMOPLASTIC, SOLID, YELLOW, 6 IN. <br />1464 <br />2516 <br />1052 <br />LFT <br />$2.50 <br />$6,290.00 <br />$2,630.00 <br />13 <br />DENSE GRADED SUBBASE <br />313 <br />339.48 <br />26.48 <br />CYS <br />$118.38 <br />$40,187.64 <br />$3,134.70 <br />51 <br />BENCH <br />2 <br />3 <br />1 <br />EACH <br />$4,122.32 <br />$12,366.96 <br />$4,122.32 <br />36 <br />INLET, TYPE J10 <br />3 <br />4 <br />1 <br />EACH <br />$4,273.18 <br />$17,092.72 <br />$4,273.18 <br />22 <br />CURB RAMP, CONCRETE <br />112 <br />139.39 <br />27.39 <br />SYS <br />$215.49 <br />$30,037.15 <br />$5,902.27 <br />