WALKER FIELD - FINAL COMPARISON OF ESTIMATES
<br />No. ITEMS
<br />Over/
<br />Quantity Placed Under UNIT UNIT PRICE APPLICATION TOTAL EXTENSION
<br />29
<br />FIELD OFFICE, TYPE C
<br />6
<br />0
<br />-6
<br />MOS
<br />$7,918.18
<br />$0.00
<br />($47,509.08)
<br />8
<br />BORROW
<br />598
<br />155.78
<br />-442.22
<br />CYS
<br />$72.48
<br />$11,290.93
<br />($32,052.11)
<br />25
<br />CURB AND GUTTER, COMBINED
<br />1421
<br />1002
<br />-419
<br />LFT
<br />$30.09
<br />$30,150.18
<br />($12,607.71)
<br />37
<br />INLET, TYPE M10
<br />6
<br />4
<br />-2
<br />EACH
<br />$4,956.62
<br />$19,826.48
<br />($9,913.24)
<br />30
<br />PIPE, TYPE 2, CIRCULAR, DIAMETER 12 IN.
<br />563
<br />467
<br />-96
<br />LFT
<br />$102.80
<br />$48,007.60
<br />($9,868.80)
<br />31
<br />HMA FOR STRUCTURE INSTALLATION, TYPE B
<br />86
<br />50
<br />-36
<br />TON
<br />$174.57
<br />$8,728.50
<br />($6,284.52)
<br />21
<br />SIDEWALK, CONCRETE
<br />1495
<br />1400.44
<br />-94.56
<br />SYS
<br />$63.78
<br />$89,320.06
<br />($6,031.04)
<br />26
<br />HMA FOR APPROACHES, TYPE B
<br />18
<br />0
<br />-18
<br />TON
<br />$259.52
<br />$0.00
<br />($4,671.36)
<br />3
<br />PAVEMENT REMOVAL
<br />1545
<br />1435
<br />-110
<br />SYS
<br />$33.24
<br />$47,699.40
<br />($3,656.40)
<br />47
<br />TRANSV THERMOPLASTIC XHATCH LINE, WHITE, 12"
<br />450
<br />117
<br />-333
<br />LFT
<br />$10.00
<br />$1,170.00
<br />($3,330.00)
<br />19
<br />HMA WEDGE AND LEVEL, TYPE B
<br />19
<br />12
<br />-7
<br />TON
<br />$414.89
<br />$4,978.68
<br />($2,904.23)
<br />33
<br />GEOTEXTILE FOR PIPE TYPE 2B
<br />644
<br />0
<br />-644
<br />SYS
<br />$3.68
<br />$0.00
<br />($2,369.92)
<br />17
<br />JOINTADHESIVE, SURFACE
<br />2136
<br />0
<br />-2136
<br />LFT
<br />$0.78
<br />$0.00
<br />($1,666.08)
<br />45
<br />LINE, THERMOPLASTIC, SOLID, WHITE, 6 IN.
<br />1457
<br />1171
<br />-286
<br />LFT
<br />$2.50
<br />$2,927.50
<br />($715.00)
<br />18
<br />LIQUID ASPHALT SEALANT
<br />2136
<br />0
<br />-2136
<br />LFT
<br />$0.30
<br />$0.00
<br />($640.80)
<br />32
<br />VIDEO INSPECTION FOR PIPE
<br />563
<br />440.63
<br />-122.37
<br />LFT
<br />$4.45
<br />$1,960.80
<br />($544.55)
<br />42
<br />TRANSV THERMOPLASTIC XWALK LINE, WHITE, 24"
<br />250
<br />216
<br />-34
<br />LFT
<br />$15.00
<br />$3,240.00
<br />($510.00)
<br />4
<br />CURB, CONCRETE, REMOVE
<br />1648
<br />1638
<br />-10
<br />LFT
<br />$19.91
<br />$32,612.58
<br />($199.10)
<br />16
<br />QC/QA-HMA, 3, 58H, SURFACE, 9.5 mm
<br />173
<br />171.6
<br />-1.4
<br />TON
<br />$136.41
<br />$23,407.96
<br />($190.97)
<br />44
<br />LINE, THERMOPLASTIC, SOLID, WHITE, 24 IN.
<br />108
<br />98
<br />-10
<br />LFT
<br />$15.00
<br />$1,470.00
<br />($150.00)
<br />20
<br />ASPHALT FOR TACK COAT
<br />1
<br />1.26
<br />0.26
<br />TON
<br />$719.17
<br />$906.15
<br />$186.98
<br />49
<br />TREE PROTECTION
<br />984
<br />1045
<br />61
<br />LFT
<br />$6.32
<br />$6,604.40
<br />$385.52
<br />23
<br />DETECTABLE WARNING SURFACES
<br />22
<br />24.3
<br />2.3
<br />SYS
<br />$172.88
<br />$4,200.98
<br />$397.62
<br />28
<br />SODDING, NURSERY
<br />3167
<br />3212
<br />45
<br />SYS
<br />$11.93
<br />$38,319.16
<br />$536.85
<br />65
<br />CO3 - Speed Bump Signs
<br />0
<br />4
<br />4
<br />0
<br />$374.00
<br />$1,496.00
<br />$1,496.00
<br />12
<br />COMPACTED AGGREGATE, NO.53
<br />84
<br />101.77
<br />17.77
<br />CYS
<br />$138.40
<br />$14,084.97
<br />$2,459.37
<br />63
<br />C01- Message Boards
<br />0
<br />1
<br />1
<br />LSM
<br />$2,500.00
<br />$2,500.00
<br />$2,500.00
<br />46
<br />LINE, THERMOPLASTIC, SOLID, YELLOW, 6 IN.
<br />1464
<br />2516
<br />1052
<br />LFT
<br />$2.50
<br />$6,290.00
<br />$2,630.00
<br />13
<br />DENSE GRADED SUBBASE
<br />313
<br />339.48
<br />26.48
<br />CYS
<br />$118.38
<br />$40,187.64
<br />$3,134.70
<br />51
<br />BENCH
<br />2
<br />3
<br />1
<br />EACH
<br />$4,122.32
<br />$12,366.96
<br />$4,122.32
<br />36
<br />INLET, TYPE J10
<br />3
<br />4
<br />1
<br />EACH
<br />$4,273.18
<br />$17,092.72
<br />$4,273.18
<br />22
<br />CURB RAMP, CONCRETE
<br />112
<br />139.39
<br />27.39
<br />SYS
<br />$215.49
<br />$30,037.15
<br />$5,902.27
<br />
|