CITY OF SOUTH BEND, INDIANA (Sp <br />DEPARTMENT OF PUBLIC WORKS <br />PROJECT CHANGE ORDER <br />DATE: 8/15/2025 <br />PROJECT NO: 123-058 <br />PROJECT NAME: Walker Field Park Connectivity <br />CONTRACT DATE: 9 10 2024 <br />CHANGE ORDER NO: 1 <br />SUBJECT OF CHANGE ORDER: PCR #1-PAVEMENT REMOVAL, PCR #2-CURB CONCRETE, <br />REMOVE, PCR #3-BORROW , PCR #4-STRUCTURE BACKFILL, <br />TYPE II , PCR #5-COMPACTED AGGREGATE, NO. 53, PCR #6- <br />DENSE GRADED SUBBASE, PCR #7-QC/QA-HMA, 3, 58H, <br />SURFACE, 9.5 mm , PCR #8-JOINT ADHESIVE, SURFACE, PCR <br />#9-LIQUID ASPHALT SEALANT, PCR #10-HMA WEDGE AND <br />LEVEL, TYPE B , PCR #11-ASPHALT FOR TACK COAT, PCR #12- <br />SIDEWALK, CONCRETE, PCR #13-CURB RAMP, CONCRETE, <br />PCR #14-DETECTABLE WARNING SURFACES, PCR #15-CURB, <br />CONCRETE, PCR #16-CURB AND GUTTER, COMBINED, PCR <br />#17-HMA FOR APPROACHES, TYPE B , PCR #18-SODDING, <br />NURSERY, PCR #19-FIELD OFFICE, TYPE C , PCR #20-PIPE, <br />TYPE 2, CIRCULAR, DIAMETER 12 IN., PCR #21-GEOTEXTILE <br />FOR PIPE TYPE 2B , PCR #22-VIDEO INSPECTION FOR PIPE, <br />PCR #23-ADJUST WATER VALVE TO GRADE, PCR #24- <br />GEOTEXTILE FOR PIPE TYPE 213, PCR #25-INLET, TYPE A 0, <br />PCR #26-INLET, TYPE M10 , PCR #29-TRANSV THERMOPLASTIC <br />XWALK LINE, WHITE, 24" , PCR #-LINE, THERMOPLASTIC, <br />SOLID, WHITE, 24 IN. , PCR #32-LINE, THERMOPLASTIC, SOLID, <br />WHITE, 6 IN., PCR #33-LINE, THERMOPLASTIC, SOLID, <br />YELLOW, 6 IN., PCR #34-TRANSV THERMOPLASTIC XHATCH <br />LINE, WHITE, 12" , PCR #35-SPEED TABLE, PCR #36-TREE <br />PROTECTION, PCR #40-PLANTING SOIL, PCR #42-SPEED <br />BUMP SIGNS, PCR #43-BENCH , PCR #44-MESSAGE BOARDS, <br />PCR #45-FULL DEPTH REPLACEMENT <br />The original contract sum 1,357,388.00 <br />Net change by previously authorized change orders $ 0.00 <br />The contract sum prior to this change order $ 1,357,388.00 <br />By this Change Order, the project amount is Olncreased <br />Decreased $ 29,715.71 <br />The new contract sum including this change order $ 1,387,103.71 <br />This Change Order represents a total change of 2.19 % <br />Total change for entire project 2.19 % <br />Original contracted completion date/time 7/31/2025 <br />Extension of date/time by previous change orders 0 days <br />Date/time extension by this change order 0 days <br />New completion date/time 7/31/2025 <br />