CITY OF SOUTH BEND, INDIANA (Sp
<br />DEPARTMENT OF PUBLIC WORKS
<br />PROJECT CHANGE ORDER
<br />DATE: 8/15/2025
<br />PROJECT NO: 123-058
<br />PROJECT NAME: Walker Field Park Connectivity
<br />CONTRACT DATE: 9 10 2024
<br />CHANGE ORDER NO: 1
<br />SUBJECT OF CHANGE ORDER: PCR #1-PAVEMENT REMOVAL, PCR #2-CURB CONCRETE,
<br />REMOVE, PCR #3-BORROW , PCR #4-STRUCTURE BACKFILL,
<br />TYPE II , PCR #5-COMPACTED AGGREGATE, NO. 53, PCR #6-
<br />DENSE GRADED SUBBASE, PCR #7-QC/QA-HMA, 3, 58H,
<br />SURFACE, 9.5 mm , PCR #8-JOINT ADHESIVE, SURFACE, PCR
<br />#9-LIQUID ASPHALT SEALANT, PCR #10-HMA WEDGE AND
<br />LEVEL, TYPE B , PCR #11-ASPHALT FOR TACK COAT, PCR #12-
<br />SIDEWALK, CONCRETE, PCR #13-CURB RAMP, CONCRETE,
<br />PCR #14-DETECTABLE WARNING SURFACES, PCR #15-CURB,
<br />CONCRETE, PCR #16-CURB AND GUTTER, COMBINED, PCR
<br />#17-HMA FOR APPROACHES, TYPE B , PCR #18-SODDING,
<br />NURSERY, PCR #19-FIELD OFFICE, TYPE C , PCR #20-PIPE,
<br />TYPE 2, CIRCULAR, DIAMETER 12 IN., PCR #21-GEOTEXTILE
<br />FOR PIPE TYPE 2B , PCR #22-VIDEO INSPECTION FOR PIPE,
<br />PCR #23-ADJUST WATER VALVE TO GRADE, PCR #24-
<br />GEOTEXTILE FOR PIPE TYPE 213, PCR #25-INLET, TYPE A 0,
<br />PCR #26-INLET, TYPE M10 , PCR #29-TRANSV THERMOPLASTIC
<br />XWALK LINE, WHITE, 24" , PCR #-LINE, THERMOPLASTIC,
<br />SOLID, WHITE, 24 IN. , PCR #32-LINE, THERMOPLASTIC, SOLID,
<br />WHITE, 6 IN., PCR #33-LINE, THERMOPLASTIC, SOLID,
<br />YELLOW, 6 IN., PCR #34-TRANSV THERMOPLASTIC XHATCH
<br />LINE, WHITE, 12" , PCR #35-SPEED TABLE, PCR #36-TREE
<br />PROTECTION, PCR #40-PLANTING SOIL, PCR #42-SPEED
<br />BUMP SIGNS, PCR #43-BENCH , PCR #44-MESSAGE BOARDS,
<br />PCR #45-FULL DEPTH REPLACEMENT
<br />The original contract sum 1,357,388.00
<br />Net change by previously authorized change orders $ 0.00
<br />The contract sum prior to this change order $ 1,357,388.00
<br />By this Change Order, the project amount is Olncreased
<br />Decreased $ 29,715.71
<br />The new contract sum including this change order $ 1,387,103.71
<br />This Change Order represents a total change of 2.19 %
<br />Total change for entire project 2.19 %
<br />Original contracted completion date/time 7/31/2025
<br />Extension of date/time by previous change orders 0 days
<br />Date/time extension by this change order 0 days
<br />New completion date/time 7/31/2025