Laserfiche WebLink
Indiana Department of Environmental Management (IDEM) "Notification of Demolition" <br />form and instructions shall be provided as included in these specifications. <br />3. The Contractor shall work continuously until all site demolitions have been completed in <br />accordance with these specifications. <br />4. The total contract time for completing the work is listed below. The contract time will start <br />when the Notice to Proceed is delivered and signed. The Notice to Proceed will be issued <br />at the Pre -Construction meeting, which will be set by the project inspector. <br />5. All BASE BID work shall have a final completion date of December 19, 2025. <br />6. Contractor shall provide a schedule to the Owner prior to beginning any work on the site <br />XIV. CHANGE OF CONTRACT TIME <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 <br />B. Additions: <br />The Contract Time may only be changed by Change Order. Any Claim for an extension in <br />the Contract Time shall be based on written notice delivered to the Department of Public <br />Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. <br />Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) <br />calendar days after such occurrence unless an official of the Public Works Department <br />allows an additional period of time to ascertain more accurate data. The Contract Time <br />will be extended in an amount equal to time lost to delays beyond the control of the <br />Contractor if a claim is made in accordance with this provision. Such delays shall include <br />acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, <br />abnormal weather conditions, governmental procedures, or acts of God. <br />2. Unless otherwise provided, the Contract time is based upon normal weather conditions. <br />An extension is granted for weather conditions significantly more severe than normal if the <br />Contractor demonstrates to the satisfaction of the City that the delay in the progress of the <br />work was due to such weather. The basis to define normal weather with be the data <br />compiled by the United States Department of Commerce, National Oceanic and <br />Atmospheric Administration (NOAA). <br />3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, <br />including fault or negligence of Contractor's subcontractors, caused the delay, or for which <br />any remedies are provided under any other provision of this agreement. <br />4. The grant of an extension of time under this Section in no way constitutes a waiver by the <br />City of any rights or remedies existing under this contract at law or in equity. <br />XV. DEFAULT AND TERMINATION <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 <br />B. Additions: <br />1. Events of Default shall include Contractor's failure to perform any of its obligations under <br />this contract including failure to commence work at the time specified, failure to perform <br />the work in accordance with these specifications, unauthorized discontinuation of the work, <br />failure to carry out the work in a manner acceptable to the City, failure to observe Federal, <br />Version 07/19/2023 Special Provisions - 6 <br />