My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - WWTP Headworks Office Improvements Proj No 125-023 - Larson-Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - WWTP Headworks Office Improvements Proj No 125-023 - Larson-Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 1:44:34 PM
Creation date
8/12/2025 1:41:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LARSON <br />DEAN 1 E LSON <br />Cons"ction Company, Inc. <br />QUALITY CONSTRUCTION SINCE'1908 <br />302 Tyler Street • LaPorte, Indiana 46350 <br />(219) 362-2127 • Fax (219) 362-2848 <br />South Bend Wastewater Treatment Plant <br />Bid Clarification Sheet 08/ 12/2025 <br />Headworks Office Improvements <br />I. Acknowledge Addendum #1. <br />2. All work is figured for standard weekday working hours, M-F 7:00am — 3:30pm. Excludes <br />Holidays & Premium Time. <br />3. Builder's risk & all bonds are excluded from this proposal. Any such items are additional. <br />4. Sales Taxes are excluded for this project. A tax exemption form is required for credit, <br />otherwise this is additional to bid. <br />S. Base bid includes an estimate cost of $750 for local permit fees. Adjustment to the final cost <br />may change once final permit fee is determined. Excludes submitting down state. <br />6. Excludes working in, around & over equipment that is located in the construction area. There <br />must be an adequate room for construction equipment, demolition, unloading & staging of <br />materials, construction of new spaces & storage of tools at the immediate site location. All <br />equipment is to be moved out & reinstalled once completed by others. <br />7. Work not described in this scope of work or different to assumptions will be completed by <br />approved Change Orders. <br />8. The wall construction is metal stud framing with batt insulation in the cavity with 5/8" drywall on <br />each side of walls. <br />9. Delivery of the doors, frames & hardware may be up to 8 weeks. <br />10. All final keying is by the client. We are only providing passage sets for all doors. <br />11. Excludes any windows in the Office walls (not graphically shown). Windows will be provided in <br />the (2) Office doors as half glass. <br />12. Excludes painting of any MEP items. <br />13. Excludes any cost for "utility bills". <br />14. Minor floor prep is included but excludes leveling or smoothing of floors. <br />Framing Materials: (Product Data isn't provided since these are standard materials) <br />• (100) .27 caliber red actuated loads <br />• (100) .22 caliber actuated shots <br />• (100) 1 " pin with washer fasteners <br />• (100) #8x 1 /2" metal stud screws <br />• (10) 3 5/8"x I O'-0"x2Oga. metal track <br />• (40) 3 5/8"x 10'-9"x2Oga. metal studs <br />• (25) 4'-Ox10'-0"x5/8" Type "X" drywall <br />• (2) 5# box of 1 '''A" self -drilling drywall screws <br />• (220) square feet of 15"x40'4' R-13 non -faced insulation <br />• (6) Tear away bead <br />• (12) 10 oz. tubes of paintable white caulk <br />• (10) pieces of wall angle <br />• (8) pieces of main tees <br />• (30) T-O" cross tees <br />• (30) 4'-0" cross tees <br />• (2) Cartons of 2'x4' Fine Fissured Non -Directional ceiling tiles (Square edge) <br />• (16) Tie wires with pins <br />www.ldconstruction.com Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.