My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ratify Emergency Sewer Repair - Ewing & High Street - Selege Construction Co., Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Ratify Emergency Sewer Repair - Ewing & High Street - Selege Construction Co., Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:51:04 AM
Creation date
8/12/2025 11:50:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Theresa Heffner, Clerk of the Board of Public Works <br />FROM: Becca Plantz, PE, Assistant City Engineer <br />SUBJECT: Ratify Emergency Work <br />Emergency Sewer Repair at Ewing and High Street <br />DATE: July 22, 2025 <br />The Division of Engineering and Division of Streets & Sewers requests the Board of Public Works <br />approval and ratification of an emergency purchase order contract with Selge Construction Co., <br />Inc. for sanitary sewer pipe replacement and repair. <br />The Division of Streets & Sewers promptly identified the need for this emergency work following <br />the completion of a water main repair at the Ewing & High Street intersection. Internal <br />investigations on June 12, 2025, found the main line and the drop line to the manhole were <br />collapsed adjacent to the water main repair, causing an almost complete obstruction of the <br />combined sewer with several services connected. Immediate action was necessary to prevent <br />potential backflow issues caused by a collapse in the combined sewer. The impacted connecting <br />inlets were reconnected to manhole and the open cut was restored. <br />Selge Construction Co., Inc. was contracted on a time and materials basis for the emergency <br />repair work after contacting additional contractors about availability. The invoice for the work <br />completed by Selge Construction Co., Inc. is attached. <br />Total Emergency Repair Cost from Selge Construction Co., Inc.: $48,980.41 <br />Emergency Purchase Order PO-0038480 was paid through Sewage Works Operations. <br />Please call with your questions 5998. <br />CITY OF SOUTH BEND, INDIANA <br />BOARD OF PUBLIC WORKS <br />Elizabeth A. Maradik, President <br />Gary A. Gilot, Member <br />Murray L. Miller, Member <br />Joseph R. Molnar, Vice President <br />Breana Micou, Member <br />hvk�f <br />Attest: Hillary R. Horvath, Clerk <br />Date: August 12, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.