My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 6 - MLK Dream Center Proj No 121-066 - CH Garmong & Son
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No 6 - MLK Dream Center Proj No 121-066 - CH Garmong & Son
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:49:49 AM
Creation date
8/12/2025 11:49:36 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12,""AIA Document G701® — 2017 <br />Change Order <br />PROJECT: (Name and address) <br />Martin Luther King Jr. Dream Center <br />1522 Linden Ave <br />South Bend, IN 46628 <br />CONTRACT INFORMATION: <br />Contract For: General Construction <br />Date: May 31, 2023 <br />OWNER: (Name and address) ARCHITECT: (Name and address) <br />City of South Bend Meticulous Design + Architecture <br />227 W. Jefferson Blvd., Ste. 1316 South 25 N. Pine Street, Ste. B <br />Bend, IN 46601 <br />CHANGE ORDER INFORMATION: <br />Change Order Number: 006 <br />Date: July 31, 2025 <br />CONTRACTOR: (Name and address) <br />C.H. Garmong & Son, Inc. <br />3050 Poplar Street <br />Indianapolis, IN 46202 Terre Haute, IN 47803 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, ifapplicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives.) <br />Final GMP Reconciliation - See Attached <br />The original Contract Sum was <br />$ 24,497,885.00 <br />The net change by previously authorized Change Orders <br />$ 364,424.39 <br />The Contract Sum prior to this Change Order was <br />$ 24,862,309.39 <br />The Contract Sum will be increased by this Change Order in the amount of <br />$ 358,994.35 <br />The new Contract Sum including this Change Order will be <br />$ 25,221,303.74 <br />The Contract Time will be unchanged by Zero (0) days. <br />The new date of Substantial Completion will be February 28, 2025. <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />C.H. Garmong & Son, Inc. <br />City of South Bend <br />ARCHITECT (Firm name) CONTRACTOR (Firm name) <br />OWNER <br />m�/Z4'r2142C�'li <br />SIGNATURE SIGNATURE <br />SIGNATURE <br />Lance Gassert, Chief Operating <br />Patrick Sherman, Project Manager <br />Officer <br />PRINTED NAME AND TITLE PRINTED NAME AND TITLE <br />PRINTED NAME AND TITLE <br />DATE <br />DATE <br />DATE <br />CITY OF SOUTH BEND, INDIANA <br />BOARD OF PUBLIC WORKS <br />a <br />/Z y y� <br />1/ 0 � � <br />Elizabeth A. Maradik, President <br />Joseph R. Molnar, Vice President <br />�-`� Gfs�1-eilot <br />Gary A. Gilot, Member <br />Breana Micou, Member <br />,/� <br />B0✓ <br />Ihts reserved. "The American Institute of Architects," "American Institute of <br />-he <br />American Institute of Architects. This document was produced at 12:31:26 <br />i for resale, is licensed for one-time use only, and may only be used in <br />Murray L. Miller, Member <br />Attest: Hillary R. Horvath, Clerk <br />it violations, e-mail docinfo@aiacontracts.com. <br />Date: August 12, 2025 <br />(389ADA43) <br />
The URL can be used to link to this page
Your browser does not support the video tag.