My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lathrop Water Main Loop Proj No 125-035 - A&Z Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Lathrop Water Main Loop Proj No 125-035 - A&Z Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:50:58 AM
Creation date
8/12/2025 11:49:33 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
h. Bidding and Negotiating Phase <br />i. Construction Phase <br />j. Reimbursable Expenses <br />$ 6,400 <br />$ 7,100 <br />$ 2,990 <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period. <br />B. Period of Service: The compensation amount stipulated in Compensation Packet BC-2 is <br />conditioned on a period of service not exceeding 24 months. If such period of service is <br />extended, the compensation amount for Engineer's services shall be appropriately adjusted. <br />Page 2 <br />Exhibit C —Compensation Packet BC-1: Basic Services (other than RPR) — Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.