Laserfiche WebLink
h. Bidding and Negotiating Phase <br />i. Construction Phase <br />j. Reimbursable Expenses <br />$ 6,400 <br />$ 7,100 <br />$ 2,990 <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period. <br />B. Period of Service: The compensation amount stipulated in Compensation Packet BC-2 is <br />conditioned on a period of service not exceeding 24 months. If such period of service is <br />extended, the compensation amount for Engineer's services shall be appropriately adjusted. <br />Page 2 <br />Exhibit C —Compensation Packet BC-1: Basic Services (other than RPR) — Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />