My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lathrop Water Main Loop Proj No 125-035 - A&Z Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Lathrop Water Main Loop Proj No 125-035 - A&Z Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:50:58 AM
Creation date
8/12/2025 11:49:33 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Compensation for Additional Services (as described in Exhibit A, Part 2) <br />Decision Question: Which method of compensation is to be used? <br />Standard Hourly Rates <br />Direct Labor Costs <br />Times a Factor <br />Salary Costs Times <br />a Factor <br />Use This Additional <br />Services <br />Packet AS-1 <br />paeket, <br />P -4 <br />Compensation <br />Packet <br />Include This <br />Appendices 1 and 2 <br />Appendix <br />Appendix f <br />Appendix <br />Example: If Basic Services (other than RPR) will be compensated using Lump Sum; RPR services using Direct Labor Times a <br />Factor; and Additional Services using Standard Hourly Rates; then use Packet BC-1; Packet RPR-4; Packet AS-1; and <br />Appendices 1 and 2 to form Exhibit C. <br />Page 2 <br />(Exhibit C — Compensation Decision Guide) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.