My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - WWTP Digital Twin Sensors Installation Proj No 124-036 - Sweney Electric Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Quotations & Proposals
>
Award Quote - WWTP Digital Twin Sensors Installation Proj No 124-036 - Sweney Electric Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:50:02 AM
Creation date
8/12/2025 11:49:22 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIV. OF ENGINEERING & DIV. OF WATER <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Hillary Horvath, Clerk of the Board of Public Works <br />FROM: Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: Agenda Request— Quote Award <br />Wastewater Treatment Plant Digital Twin Sensors Installation <br />Project No. 124-036 / DFO PROJ00000560 <br />DATE: August 5, 2025 <br />The Board of Public Works received and opened public bids for the subject project at its <br />Regular Meeting on July 22, 2025. The Department of Public Works, Division of Engineering, <br />Division of Wastewater have reviewed the lone quote received from Sweney Electric Co., Inc. <br />The quote price ranked as follows: <br />M <br />BIDDER <br />BASE BID <br />1. SweneyElectric Co., Inc. Merrillville, IN <br />$109,150.00 <br />Bid Assessment: <br />City Engineering provided the Quote Review subject quote, and the lone bidders appeared to <br />submit a complete bid and provided an explanation why they were unable to meet the MBE and <br />WBE goals at the time of the quote submission. Sweney Electric Co., Inc. has worked as a <br />subcontractor for general contractors on recent projects at the Wastewater Treatment Plant and <br />are familiar with the facility. Their work product for electrical wiring and instrumentation <br />installation work on previous projects has been exceptional and accurate. They are currently <br />mobilized at the Wastewater Treatment Plant and performing work for the WWTP Equalization <br />Basin and WWTP Final Clarifier 1, 2, and 3 projects. This is the first project they have quoted <br />as a general contractor and have staff available to complete the work that has a tight project <br />schedule. <br />This project has a Minority Business Enterprise (MBE) Utilization Goal of 1.2% and a Women <br />Business Enterprise (WBE) Utilization Goal of 4.3% which was determined based on the <br />M/WBE contractor availability in our program plan region. Sweney Electric Co., Inc. provided <br />MBE Utilization Plan and WBE Utilization Plan Forms, but they were unable to secure <br />participation at the time of the quote submission. Review of Sweney Electric's quote indicates <br />some MBE and WBE good faith efforts were made to contact and obtain quotations for <br />subcontractor work or materials supply. The dominant portion of this work is single electrical <br />contractor work. The anticipated MBE and WBE participation would be accomplished through <br />supply chain. Very little work on this project is non -electrical. <br />
The URL can be used to link to this page
Your browser does not support the video tag.