My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - 2025 Guardrail Improvements Proj No 124-026 - C-Tech Corp
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No 1 - 2025 Guardrail Improvements Proj No 124-026 - C-Tech Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:49:17 AM
Creation date
8/12/2025 11:49:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O WoTH 8��d <br />ii COR # DATE <br />\PEACE � jj <br />� 1 07/31/2025 <br />% 1865 x <br />Subject: Division 3- Intersection of Lilac Road and Eagle <br />Point Drive Revision and Addition of Byer's <br />Requested By: Public Works Engineering (City of South <br />Bend) <br />BILL TO PROJECT <br />City of South Bend 2025 Guardrail Improvements <br />Public Works Engineering PROJECT #: 124-026 <br />227 West Jefferson Boulevard South Bend, IN 46601 <br />South Bend, IN 46601 <br />DESCRIPTION <br />Add 12.5 LFT MGS Guardrail, 6'-3" Post Spacing per Pay item 5 <br />Addition of guardrail installation on Byer's Complex Entrance <br />Item Name <br />Qty <br />Price/Unit <br />Total <br />MGS W-Beam Guardrail, 6'-3" Post SPA <br />12.50 <br />$46.00/1 <br />$575.00 <br />Add 12.5 LFT MGS W-Beam Guardrail, 6'-Y Post SPA at north end, west side of Lilac <br />L i IN A <br />`)b � <br />Road to adjust for existing storm sewer and existing adjacent ditch grading. <br />Div 4: Mob and Demob <br />1 <br />$4,000.00/LS <br />$4,000.00 <br />Div 4: Maintenance of Traffic <br />1 <br />$3,200.00/LS <br />$3,200.00 <br />Div 4: Remove wood posts and backfill <br />1 <br />$4,300,00/LS <br />$4,300.00 <br />Div 4: Reset Existing sign and post <br />3 <br />$500.00/EA <br />$1,500.00 <br />Div 4: MGS W-Beam Guardrail, Shop Curve, 30' RAD, 90 deg bend <br />1 4y <br />$800.00/�r <br />$8ao.00 <br />Div 4: MGS W-Beam Guardrail, 6'-3" Post SPA. <br />250 <br />$27.00/1-F <br />$6,750.00 <br />Div 4: SKT-SP Guardrail End Treatment, 25 LFT <br />2 <br />$3,300.00/EA <br />$6,600.00 <br />Div 4: Hand Dig Guardrail Post Hole, Undistributed <br />5 <br />$350.00/EA <br />$1,750.00 <br />- <br />Div 4: Guardrail Reflector, 2-way, white <br />27 <br />$20.00/EA <br />$540.00 <br />Div 4: Topsoil, bin Thick <br />80 <br />$20.00/SY <br />$1,600.00 <br />Div 4: Mulched Seeding, Type "R" <br />So <br />$4.00/SY <br />$320.00 <br />�j�3cno <br />t s7s � <br />City of5octh Bend, Public Works Engineering, Phone: (574) 235-9251 <br />227 W. feffersoo Blvd., Svite 1316, South Bend, IN 46601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.