Laserfiche WebLink
Soils and Water Table Review Requirement Ordinance <br />Page 2 <br />• "Published Soil Surveys for Indiana — Updates" maintained and updated by the U.S. <br />Department of Agriculture's Natural Resources Conservation Service which <br />specifically provides data on St. Joseph County, Indiana <br />• USGS Groundwater Publications available at http://water.usgs.gov/ogw/])ubs.html <br />The Common Council recognizes the qualifications, duties, responsibilities of the <br />Building Commissioner set forth in Section 6 -4.4 of the South Bend Municipal Code. The <br />training and expertise of this key position and the Building Commissioner's ability to issue or <br />deny permits after a detailed review to determine compliance with and enforcement of the <br />building regulations codified in Chapter 6 of the South Bend Municipal Code is critical. The <br />proposed regulations addressing soils and water table review would improve the permit review <br />process. It further authorizes the Building Commissioner to work in conjunction with the <br />Director of Public Works and other agencies when conducting soils and water table reviews. <br />This ordinance has been prepared in the interest of providing essential tools and <br />establish reasonable mechanisms for caring out such detailed reviews by the Building <br />Department. It provides the necessary enabling legislation so that regular, systematic and <br />routine reviews of soils and water tables are made prior to a permit being issued to build <br />or construct any new building or structure or enlarge or move an existing structure within <br />the City of South Bend, Indiana. <br />This ordinance is believed to be in the best interests of the citizens of the City of South <br />Bend, Indiana. <br />. A—e Geliooz&,�rel by the Common Council of the City of South Bend, <br />Indiana, as follows: <br />Section I. Chapter 6 of the South Bend Municipal Code is amended by the inclusion of new <br />Section 6 -6.6 in Article 2 which shall read in its entirety as follows: <br />Sec. 6 -6.6 Soils and Water Table Review Required as Part of the Permit Process. <br />(a) Before a permit to build or construct any new building or structure or enlarge or move <br />an existing structure within the City, a soils and water table review of the immediate land <br />proposed for such building, construction, enlargement or relocation to the subject property, must <br />be made by the Building Commissioner. <br />(b) The Building Commissioner, or his/her authorized designee shall review as part of <br />the building permit process, in addition to the requirements set forth in this Chapter, the subject <br />property's location on: <br />(1) St. Joseph County Soils Map <br />