Laserfiche WebLink
c. Warranties on all parts <br />d. Installation and safety requirements <br />)Cif, OTHER UTILITIES <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. The Contractor shall verify the locations of all utilities by contacting Indiana811 by calling 611 (in <br />Indiana) or 1-800-382-5544 (outside of Indiana), or via www,indi2na811.oM, at least two (2) <br />working days, not counting Saturdays, Sundays or federal and state holidays before proceeding <br />with construction. It shall also be the Contractor's responsibility to contact any other utility that is <br />not contacted by Indiana811 and verify the utility locations. <br />2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, <br />etc. in order to assure that all utilities that need to be replaced or relocated can be done with a <br />minimum disturbance to service. The Contractor shall also be responsible for coordinating <br />schedules with the varlous utilities such that they can proceed with their relocation work as <br />efficiently as possible. <br />3. If the odor of natural gas is detected In a work area at any time during the course of work, the <br />Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also <br />immediately notify the residents of adjacent properties. The Contractor shall advise the residents <br />to evacuate their homes immediately if the odor is present within the dwelling. <br />4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the <br />Contractor at no additional cost to the City or the Owner of the system. <br />XVI. MAINTENANCE OF TRAFFIC <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Sections 105 & 801 <br />B. Additions: <br />1. Maintenance of traffic during construction shall conform to the 'Indiana Manual on Uniform Traffic <br />Control Devices" and the City of South Bend Design and Construction Standards. <br />2. The attached `Traffic Closure Request form is to be used for any lane restrictions or closures and <br />required to be filled out and sent to the Department of Public Works <br />3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner <br />that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve the <br />method of traffic control. No construction equipment, vehicles, materials, supplies or temporary facilities <br />shall be left unattended in the right-of-way of any street or left parked overnight without proper <br />marking and lighting. <br />4. After the award of the contract and before beginning the work, the Contractor shall submit hisfherl'its <br />proposed schedule of operations for the review of the Engineer. The schedule of operations as <br />reviewed by the Engineer shall be maintained at all times, <br />5. There will be no direct payment for this work. <br />6. <br />XVII. DESCRIPTION OF WORK <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Work to be performed shall Include furnishing all labor, services, materials, insurance and <br />equipment to perform asphalt mfcrasurfacing (liquid pavement) within the City of South Send. <br />2, The street segments for the base bid are summarized below: <br />a. Corby Boulevard from Niles Avenue to 120 feet west of Notre Dame Avenue. <br />b. Indiana Avenue from Olive Street to Pulaski Street. <br />c. Swygart Avenue from Prairie Avenue (SR 23) to Donald Street. <br />3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor's operations. <br />XVIII, PLANS <br />Vorsion IrM 25 Page - 6 Public Works Quote <br />