My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - WWTP Digital Twin Sensors Installation Proj No 124-036 - Sweney Electric CO, Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - WWTP Digital Twin Sensors Installation Proj No 124-036 - Sweney Electric CO, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 11:38:14 AM
Creation date
7/23/2025 11:37:17 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e;;� <br />i <br />RIC CO. <br />CONTRACTORS & ENGINEERS <br />9111 LOUISIANA STREET <br />MERRILLVILLE, INDIANA 46410 <br />PHONE: (219) 769-6007 <br />July 22, 2025 <br />South Bend WWTP <br />3113 Riverside Dr. <br />South Bend, IN 46628 <br />ATTN: Board of Public Works <br />RE: South Bend WWTP Digital Twin Sensor Installation <br />Proposal:00072225-1 <br />PROPOSAL <br />We submit for your approval our proposal to furnish the labor, supervision, tools, and material necessary to perform <br />the following electrical work for the above referenced project. <br />Our Lump Sum Price to Complete Work <br />One Hundred Nine Thousand, One Hundred Fifty and 00/100 Dollars <br />$109,150.00 <br />*Breakout* <br />Aeration Tanks 1-4: $49,750.00 <br />Final Clarifiers 6 & 7-RAS Pump Station: $10,420.00 <br />Pre -Chlorination: $23,980.00 <br />System Integration Allowance: $25,000.00 <br />Inclusions: <br />• Bid Based on Contract Documents and Specifications Package Dated June 2025 and Pre -Bid Conference and <br />Site Walk Through Held on 7/15/25. <br />• Proposal Assumes Use of Existing Home Run Conduits to PLC Cabinets at Aeration Tanks and Clarifier 6 & 7 <br />RAS Pump Station. <br />• PVC Coated Galvanized Rigid Conduit Figured Above Grade. <br />• Schedule 80 PVC Conduit Figured Below Grade. <br />• Aluminum Unistrut Figured Where New is Required, Matching Existing Installations. Existing Aluminum <br />Unistrut to be Utilized Where Possible. <br />• Install Controllers Furnished by Others with Provided Brackets Where Shown. <br />• Install Junction Boxes and Sunshields Furnished by Others with Provided Brackets to Handrails Where <br />Shown. <br />• Pull Factory Provided OEM Cables Furnished by Others from Point to Point. <br />• Furnish and Install Cable for 4-20mA Signals Where Shown. <br />• Furnish and Install 1.5" Schedule 80 PVC Conduit and Mount to Handrails with Provided Brackets. Install <br />Sensors and Cables Furnished by Others Through Conduit. <br />• $25,000.00 Allowance for System Integrator Instrumentation and Controls Programming Work. <br />• As Built .pdf Drawings. <br />• Bid Bond. <br />• Permit. <br />Exclusions: <br />0 Sales Tax. <br />
The URL can be used to link to this page
Your browser does not support the video tag.