BID/PROPOSAL -ADDENDUM NO. 3
<br />CITY OF SOUTH BEND
<br />Project Name: Riverfront West Urban Neighborhood Infrastructure Improvements
<br />Project Number: 1 21 -067
<br />For Bids Due: July 22, 2025
<br />Contractor Name:
<br />BASE BID
<br />Item
<br />No.
<br />Description
<br />Unit
<br />Estimated
<br />Quantity
<br />Unit Price
<br />TotalAmount
<br />1
<br />MOBILIZATION AND DEMOBILIZATION
<br />LS
<br />1
<br />L4 I 5,aoo „Ll
<br />i si, ooa,
<br />2
<br />MAINTAINING TRAFFIC
<br />LS
<br />1
<br />3
<br />EROSION AND SEDIMENT CONTROL
<br />LS
<br />1
<br />6.71 oo©,
<br />C.-'j-7 ono,-
<br />4
<br />CONCRETE, REMOVE
<br />SYD
<br />2,598
<br />5
<br />CURB AND GUTTER CONCRETE,
<br />REMOVE
<br />LFT
<br />5,836
<br />1170
<br />6
<br />SIGN AND SUPPORTS, REMOVE
<br />EACH
<br />20
<br />2 50--
<br />7
<br />MANHOLE, REMOVE
<br />EACH
<br />19
<br />32�•—
<br />(oo$�.
<br />8
<br />INLET, REMOVE
<br />EACH
<br />33
<br />9
<br />PIPE, WATER, REMOVE
<br />LFT
<br />2,527
<br />2.5,--
<br />70 ?
<br />10
<br />PIPE, SANITARY, REMOVE
<br />LFT
<br />1,765
<br />.-
<br />q ( 7
<br />11
<br />PIPE, STORM, REMOVE
<br />LFT
<br />3,906
<br />7Jfea
<br />( Q5
<br />12
<br />FIRE HYDRANT ASSEMBLY, REMOVE
<br />EACH
<br />7
<br />13
<br />EXCAVATION, COMMON
<br />CYD
<br />18,920
<br />14
<br />B BORROW
<br />CYD
<br />10,830
<br />15
<br />STORMWATER PIPE, 60" RCP
<br />LFT
<br />552
<br />16
<br />STORMWATER PIPE, 54" RCP
<br />LFT
<br />133
<br />p$
<br />17
<br />STORMWATER PIPE, 48"
<br />LFT
<br />977
<br />YC20.r.
<br />?0 1op
<br />18
<br />STORMWATER PIPE, 24"
<br />LFT
<br />32
<br />2 ,---
<br />-7
<br />19
<br />STORMWATER PIPE,18"
<br />LFT
<br />42
<br />20
<br />STORMWATER PIPE, 15"
<br />LFT
<br />100
<br />(1 op,
<br />21
<br />STORMWATER PIPE, 15" WATER MAIN
<br />GRADE PIPE
<br />LFT
<br />35
<br />z8�
<br />l0 o(a
<br />22
<br />STORMWATER PIPE, 12"
<br />LFT
<br />405
<br />23
<br />STORMWATER PIPE, WATER MAIN
<br />GRADE PIPE
<br />LFT
<br />101
<br />24
<br />SANITARY PIPE, 36" PVC
<br />LFT
<br />593
<br />263,--
<br />25
<br />SANITARY PIPE, 36" WATER MAIN
<br />GRADE PIPE
<br />LFT
<br />198
<br />���
<br />?7 10( ,
<br />26
<br />SANITARY PIPE, 24" PVC
<br />LFT
<br />171
<br />31?z
<br />27
<br />SANITARY PIPE, 18" PVC
<br />LFT
<br />54
<br />78,E
<br />p
<br />28
<br />SANITARY PIPE, 12" PVC
<br />LFT
<br />10
<br />29
<br />SANITARY PIPE, 10" PVC
<br />LFT
<br />424
<br />[
<br />pad 3
<br />30
<br />SANITARY PIPE, 10" WATER MAIN
<br />GRADE PIPE
<br />LFT
<br />351
<br />(7f,�
<br />l t 3
<br />Version 1/3/2025 Contractor's Bid for Public Works - 7 Addendum No. 3
<br />
|