Laserfiche WebLink
14 <br />BID/PROPOSAL —ADDENDUM NO. 3 <br />CITY OF SOUTH BEND <br />Project Name: Riverfront West Urban Neighborhood Infrastructure Improvements <br />Project Number: <br />For Bids Due: <br />121-067 <br />July 22, 2025 <br />Contractor Name: HRP Construction Inc. <br />BASE BID <br />Item <br />Item <br />No. <br />Description <br />Unit <br />Estimated <br />Unit Price <br />Total Amount <br />F <br />Quantity <br />138 <br />HANDHOLE, SIGNAL, ADJUST TO GRADE <br />EACH <br />2 <br />200.00 <br />400.00 <br />139 <br />TRANSPORTATION OF SALVAGEABLE <br />SIGNAL EQUIPMENT <br />LS <br />1 <br />500.00 <br />500.00 <br />140 <br />SIGNAL POLE FOUNDATION <br />EACH <br />4 <br />700.00 <br />2,800.00 <br />141 <br />CONDUIT, HDPE, 2 IN. SCHEDULE 80 <br />LFT <br />90 <br />6.40 <br />576.00 <br />142 <br />PEDESTRIAN PUSH BUTTON, APS <br />EACH <br />8 <br />1,400.00 <br />11,200.00 <br />143 <br />SIGNAL CABLE, CONTROL, COPPER, <br />3C/14 GA <br />LFT <br />1,130 <br />2.50 <br />2,825.00 <br />144 <br />SIGNAL CABLE, CONTROL, COPPER, <br />5C/14 GA <br />LFT <br />620 <br />3.00 <br />1,860.00 <br />145 <br />SIGNAL POLE, PEDESTAL, 10 FT, <br />DECORATIVE <br />EACH <br />4 <br />1,400.00 <br />5,600.00 <br />*ON <br />160 <br />600.00 <br />96,000.00 <br />Stormwater Pi <br />e LF <br />4 <br />300.00 <br />1,200.00 <br />TOTAL BASE BID <br />ALTERNATE A <br />$ 7,706,726.54 <br />Item <br />No. <br />Description <br />Unit <br />Quantity <br />Unit Price <br />Total Amount <br />1A <br />FIBER OPTIC CONDUIT, 2- <br />LFT <br />1130 <br />6.40 <br />7,232.00 <br />2A <br />FIBER OPTIC HANDHOLE <br />EACH <br />4 <br />1,300.00 <br />5,200.00 <br />ALTERNATE A TOTAL $ 12,432.00 <br />Version 1/3/2025 Contractor's Bid for Public Works - 12 Addendum No.3 <br />