Laserfiche WebLink
BID/PROPOSAL —ADDENDUM NO. 3 <br />CITY OF SOUTH BEND <br />Project Name: Riverfront West Urban Neighborhood Infrastructure Improvements <br />Project Number: 121-067 <br />For Bids Due: July 22, 2025 <br />Contractor Name: Selge Construction Co., Inc. <br />BASE BID <br />Item <br />No. <br />Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total Amount <br />1 <br />MOBILIZATION AND DEMOBILIZATION <br />LS <br />1 <br />$ 385,500.00 <br />$ 385,500.00 <br />2 <br />MAINTAINING TRAFFIC <br />LS <br />1 <br />$ 367,500.00 <br />$ 367,500.00 <br />3 <br />EROSION AND SEDIMENT CONTROL <br />LS <br />1 <br />$ 40,000.00 <br />$ 40,000.00 <br />4 <br />CONCRETE, REMOVE <br />SYD <br />2,598 <br />$ 6.50 <br />$ 16,887.00 <br />5 <br />CURB AND GUTTER CONCRETE, <br />REMOVE <br />LFT <br />5,836 <br />$ 6.50 <br />$ 37,934.00 <br />6 <br />SIGN AND SUPPORTS, REMOVE <br />EACH <br />20 <br />300.00 <br />$ 6,000.00 <br />7 <br />MANHOLE, REMOVE <br />EACH <br />19 <br />$ 285.00 <br />5,415.00 <br />8 <br />INLET, REMOVE <br />EACH <br />® <br />$ 285.00 <br />9.405.00 <br />9 <br />PIPE, WATER, REMOVE <br />LFT <br />® <br />$ 35.25 <br />$ 89,076.75 <br />10 <br />PIPE, SANITARY, REMOVE <br />LFT <br />1,765 <br />$ 39.25 <br />$ 69,276.25 <br />11 <br />PIPE, STORM, REMOVE <br />LFT <br />$ 35.10 <br />$ 137,100. 00 <br />12 <br />FIRE HYDRANT ASSEMBLY, REMOVE <br />EACH <br />7 <br />$ 1,000.00 <br />$ 7,000.00 <br />13 <br />EXCAVATION, COMMON <br />CYD <br />18,920 <br />$ 48.75 <br />$ 922.350.00 <br />14 <br />B BORROW <br />CYD <br />10,830 <br />$ 13.65 <br />$ 147 829.50 <br />15 <br />STORMWATER PIPE, 60" RCP <br />LFT <br />552 <br />$ 545.00 <br />$ 300,840.00 <br />16 <br />STORMWATER PIPE, 54" RCP <br />LFT <br />133 <br />$ 540.00 <br />$ 71,820.00 <br />17 <br />STORMWATER PIPE, 48" <br />LFT <br />977 <br />$ 470.00 <br />459,190.00 <br />18 <br />STORMWATER PIPE, 24" <br />LFT <br />32 <br />$ 285.00 <br />$ 9,120.00 <br />19 <br />STORMWATER PIPE,18" <br />LFT <br />42 <br />$ 256.00 <br />$ 10,752.00 <br />20 <br />STORMWATER PIPE,15" <br />LFT <br />100 <br />$ 228.00 <br />$ 22,800.00 <br />21 <br />22 <br />STORMWATER PIPE,15" WATER MAIN <br />GRADE PIPE <br />LFT <br />35 <br />$ 265.00 <br />$ 9,275.00 <br />STORMWATER PIPE,12" <br />LFT <br />405 <br />$ 225.00 <br />91,125.00 <br />23 <br />STORMWATER PIPE,12" WATER MAIN <br />GRADE PIPE <br />LFT <br />101 <br />$ 235.00 <br />$ 23,735.00 <br />24 <br />SANITARY PIPE, 36" PVC <br />SANITARY PIPE, 36" WATER MAIN <br />GRADE PIPE <br />LFT <br />593 <br />$ 411.50 <br />$ 244,019.50 <br />25 <br />LFT <br />198 <br />$ 451.50 <br />$ 89,397.00 <br />26 <br />SANITARY PIPE, 24" PVC <br />LFT <br />171 <br />$ 316.50 <br />$ 54,121.50 <br />27 <br />SANITARY PIPE,18" PVC <br />LFT <br />54 <br />$ 361.50 <br />$ 19,521.00 <br />28 <br />SANITARY PIPE,12" PVC <br />LFT <br />10 <br />$ 366.50 <br />$ 3,665.00 <br />29 <br />SANITARY PIPE, 10" PVC <br />LFT <br />424 <br />$ 128.50 <br />54,484.00 <br />30 <br />SANITARY PIPE, 10" WATER MAIN <br />GRADE PIPE <br />LFT <br />351 <br />$ 135.50 <br />;$ 47,560.50 <br />Version 1/3/2025 Contractor's Bid for Public Works - 7 Addendum No. 3 <br />