Laserfiche WebLink
Page 4 <br />BC <br />S+�M1'uW uu�. SUW4.l\4 <br />BUC Construction Supply, Inc. Terms & Conditions <br />WBE Supplier/Distributor-60% <br />Precast Structure info <br />All storm structures to receive butyl mastic for joint connections, pipe connections 30" or less to be <br />booted, larger pipe openings to be grouted. <br />All sanitary structures to receive gaskets for joint connections, pipe connections to be booted. <br />48" Sanitary structures include factoryflow channel. <br />Joint wrap not included additional cost. Structures are unlined/uncoated. <br />Please see bid item 43, contractor to supply for sanitary manholes. <br />1. ALL Materials are BABA Compliant. Materials purchased after expired quote date of 8/17/25 are subject to <br />yearly escalation clause. Full truckload freight included with purchase of entire quote. BUC Construction <br />Supply, Inc. carries 3rd Party Administrative Transportation Insurance and will provide that coverage on all <br />materials purchased for this contract. The 3rd Party Administrative Transportation Certificate will be provided <br />to contractor at time of signed and executed P.O. All materials will need to ship by Spring of 2026. Ductile Iron <br />Pipe will need to be shipped by5/1/2026to secure pricing. PVC pipe will need to be shipped prior to any price <br />increase. Quote is based on BUC's interpretation of plans/specs contractor to determine final materials and/or <br />quantities. <br />2. If BUC quote is utilized for WBE Spend Goal, contact BUC ASAP to secure pricing by sending P.O. Any <br />materials purchased after 8/17/25 and/or 2026 are at market price. After P.O. is executed, all materials are <br />non -returnable and non -cancellable. <br />3. BUC shall not be held liable or responsible to the other party nor be deemed to have defaulted under or <br />breached this quote for failure or delay in fulfilling or performing any term of this quote to the extent and for so <br />long as, such failure or delays caused by or results from causes beyond the reasonable control of BUC, <br />including supply chain delays, pandemics, quarantines &weather. <br />Total: WBE 60% Spend Goal: $716,029.38 <br />ACCEPTED BY: <br />Contractor <br />BUC Construction Supply, Inc. <br />Date: <br />Date: <br />