|
Page t of 2
<br />QUOTE No.:
<br />02/0725
<br />-;tr. ;;r if❑
<br />� ,
<br />RE:
<br />City of South Bend
<br />J LRiverfront
<br />West Urban Neighborhood
<br />Signals & Lighting
<br />Infrastructure Improvements
<br />TO:
<br />1
<br />Commercial. Infrastructure. Industrial
<br />DBE
<br />N;CER'nRIM
<br />DATE:
<br />luly 21st 2025
<br />ITEM
<br />QTY
<br />UNIT
<br />DESCRIPTION
<br />UNIT COST
<br />TOTAL COST
<br />1
<br />1.00
<br />LS
<br />Mobilization and Demobilization
<br />40,000.00
<br />40,000.00
<br />6
<br />20.00
<br />Each
<br />SIGN AND SUPPORTS, REMOVE
<br />15.00
<br />300.00
<br />104
<br />154.00
<br />LIFT
<br />SIGN POST, SQUARE TYPE 2 Unreinforced Anchor Base
<br />14.00
<br />2,156.00
<br />105
<br />106
<br />121
<br />122
<br />123
<br />124
<br />125
<br />126
<br />127
<br />128
<br />129
<br />130
<br />131
<br />132
<br />133
<br />134
<br />135
<br />80.00
<br />30.00
<br />11.00
<br />1.00
<br />3,750.00
<br />18.00
<br />54.00
<br />40.00
<br />4.00
<br />14.00
<br />2.00
<br />5,510.00
<br />4,540.00
<br />1.00
<br />1.00
<br />1.00
<br />1.00
<br />SFT
<br />SFT
<br />Each
<br />LS
<br />LFT
<br />Each
<br />Each
<br />Each
<br />Each
<br />Each
<br />Each
<br />LFT
<br />LFT
<br />Each
<br />LS
<br />LS
<br />Each
<br />136 1 4.00 1 Each
<br />137
<br />138
<br />139
<br />140
<br />141
<br />142
<br />143
<br />144
<br />145
<br />1.00
<br />2.00
<br />1.00
<br />4.00
<br />90.00
<br />8.00
<br />1,130.00
<br />620.00
<br />4.00
<br />LS
<br />Each
<br />LS
<br />Each
<br />LFT
<br />Each
<br />LFT
<br />LFT
<br />Each
<br />1A 1 1,130.00 LFT
<br />2A 4.00 Each
<br />Sign, Sheet with Legend,0.125in Thinkness
<br />Sign, Sdouble Faced, Sheet, with Legend, 0.125in Thickness
<br />Light Standard and Foundation, Remove
<br />Transportation of Salvageable Items
<br />Conduit, HDPE, 2in Schedule 80
<br />Handhole Lighting
<br />Light Standard Foundation
<br />Light Standard Type A
<br />Light Standard Type A Spare
<br />Light Standard Type B
<br />Light Standard Type B Spare
<br />Wire No 4 Copper In Conduit, 4 1/C
<br />Cable Pole Circuit THWN, No 10 Copper Stranded 1/C
<br />Electric Service Point, Tesco Single Meter
<br />Misellaneous Electrical Equipment
<br />Portable Signal
<br />Relocate Existing Signal Pole, Pedestal, 1OFt Decorative
<br />RELOCATE EXISTING PEDESTRIAN Signal Head, Countdown,
<br />18IN
<br />Traffic Signal Equipment Remove
<br />Handhole Signal Adjust to Grade
<br />Transportation of Salvageable Signal Equipment
<br />Signal Pole Foundation
<br />Conduit HDPE 2In Schedule 80
<br />Pedestrain Push Button, APS
<br />Signal Cable, Control Copper 3C/14GA
<br />Signal Cable, Control Copper 5C/14GA
<br />Signal Pole, Pedestal, LOFT Decorative
<br />ALT A
<br />Fiber Optic Conduit, 2"
<br />Fiber Optic Handhole
<br />17.00
<br />20.00
<br />250.00
<br />250.00
<br />6.40
<br />1,100.00
<br />1,130.00
<br />9,000.00
<br />8,400.00
<br />14,000.00
<br />13,900.00
<br />12.00
<br />0.25
<br />11,000.00
<br />10,000.00
<br />15,000.00
<br />250.00
<br />320.00
<br />1,200.00
<br />200.00
<br />500.00
<br />700.00
<br />6.40
<br />1,400.00
<br />2.50
<br />3.00
<br />1,400.00
<br />0.00
<br />6.40
<br />1,300.00
<br />1,360.00
<br />600.00
<br />2,750.00
<br />250.00
<br />24, 000.00
<br />19,800.00
<br />61,020.00
<br />360,000.00
<br />33,600.00
<br />196,000.00
<br />27,800.00
<br />66,120.00
<br />1,135.00
<br />11,000.00
<br />10,000.00
<br />15,000.00
<br />250.00
<br />1,280.00
<br />1,200.00
<br />400.00
<br />500.00
<br />2,800.00
<br />576.00
<br />11,200.00
<br />2,825.00
<br />1,860.00
<br />5,600.00
<br />0.00
<br />7,232.00
<br />5,200.00
<br />
|