Laserfiche WebLink
Item <br />No. <br />Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total Amount <br />116 <br />PAVEMENT MESSAGE MARKING, <br />THERMOPLASTIC LANE INDICATION <br />ARROW <br />EACH <br />5 <br />125.00 <br />625.00 <br />117 <br />PAVEMENT MESSAGE MARKING, <br />THERMOPLASTIC ONLY <br />EACH <br />1 <br />125.00 <br />12500 <br />118 <br />PAVEMENT MESSAGE MARKING, <br />THERMOPLASTIC ADA ACCESSIBLE SYMBOL <br />EACH <br />2 <br />395.00 <br />790.00 <br />119 <br />PAVEMENT MESSAGE MARKING, <br />THERMOPLASTIC, ADVANCED WARNING FOR <br />AK <br />EACH <br />2 <br />1,500.00 <br />3,000.00 <br />120 <br />PAVEMENT MESSAGE MARKING, MULTI- <br />COMPONENT CHEVRON WHITE <br />EACH <br />2 <br />725.00 <br />1,450.00 <br />121 <br />LIGHT STANDARD AND FOUNDATION, <br />REMOVE <br />EACH <br />11 <br />700.00 <br />7,700.00 <br />122 <br />TRANSPORTATION OF SALVAGEABLE <br />ITEMS <br />LS <br />1 <br />1,500,00 <br />1,500.00 <br />123 <br />CONDUIT, HDPE, 2 IN. SCHEDULE 80 <br />LFT <br />3,750 <br />14.00 <br />52,500,00 <br />124 <br />HANDHOLE, LIGHTING <br />EACH <br />18 <br />2,600.00 <br />46,800.00 <br />125 <br />LIGHT STANDARD FOUNDATION <br />EACH <br />54 <br />2,425.00 <br />130,950.00 <br />126 <br />LIGHT STANDARD, TYPE A <br />EACH <br />0 <br />8,494.00 <br />339,760.00 <br />127 <br />LIGHT STANDARD, TYPE A, SPARE <br />EACH <br />4 <br />8,494.00 <br />33,976.00 <br />128 <br />LIGHT STANDARD, TYPE B <br />EACH <br />N4 <br />14,075.00 <br />197,050.00 <br />129 <br />LIGHT STANDARD, TYPE B, SPARE <br />EACH <br />2 <br />14,075.00 <br />28,150.00 <br />130 <br />WIRE, NO. 4 COPPER, IN CONDUIT, 4 <br />1/C <br />LFT <br />5,510 <br />15.00 <br />82,650.00 <br />131 <br />CABLE, POLE CIRCUIT, THWN, NO. 10 <br />COPPER, STRANDED 1/C <br />LFT <br />4,540 <br />2.00 <br />9,080.00 <br />132 <br />ELECTRIC SERVICE POINT, TESCO, SINGLE METER <br />EACH <br />1 <br />14,250.00 <br />14,250,00 <br />133 <br />MISCELLANEOUS ELECTRICAL <br />EQUIPMENT <br />LS <br />1 <br />2,400.00 <br />2,400.00 <br />134 <br />PORTABLE SIGNAL <br />LS <br />1 <br />19,000.00 <br />19,000 00 <br />135 <br />RELOCATE EXISTING SIGNAL POLE, <br />PEDESTAL, 10 FT, DECORATIVE <br />EACH <br />1 <br />300.00 <br />300.00 <br />136 <br />RELOCATE EXISTING PEDESTRIAN <br />SIGNAL HEAD, COUNTDOWN, 18 IN <br />EACH <br />4 <br />450.00 <br />1,800.00 <br />137 <br />TRAFFIC SIGNAL EQUIPMENT, REMOVE <br />LS <br />1 <br />3,000.00 <br />3,000.00 <br />138 <br />Handhole Signal Adjust to grade <br />EACH <br />2 <br />600.00 <br />1,200.00 <br />139 <br />Transport of Salvageable Signal Equipment <br />LS <br />1 <br />1,500.00 <br />1,500.00 <br />140 <br />SIGNAL POLE FOUNDATION <br />LS <br />4 <br />1,290.00 <br />5,160.00 <br />141 <br />CONDUIT, HDPE, 2 IN SCHEDULE 80 <br />LS <br />90 <br />55.00 <br />4,95000 <br />142 <br />PEDESTRIAN PUSH BUTTON APS <br />LS <br />8 <br />1,300.00 <br />10,400.00 <br />143 <br />SIGNAL CABLE CONTROL COPPER 3C/14 GA <br />LS <br />1130 <br />4.00 <br />4,520.00 <br />144 <br />SIGNAL CABLE CONTROL COPPER 5C/14 GA <br />LS <br />620 <br />6.00 <br />3,720.00 <br />145 <br />SIGNAL POLE PEDESTAL 10 FT DECORATIVE <br />LS <br />4 <br />1,500.00 <br />6,00000 <br />146 <br />HMA FOR TEMPORARY PAYMENT TYPE A <br />LS <br />160 <br />130.00 <br />20,800.00 <br />147 <br />IRRIGATION ALLOWANCE <br />LS <br />25000 <br />100 <br />25,000.00 <br />148 <br />UNFORSEEN CONDITIONS ALLOWANCE <br />LS <br />50000 <br />100 <br />50,000.00 <br />149 <br />STORMWATER PIPE 10 FT <br />LS <br />4 <br />190.00 <br />760.00 <br />LS <br />148 <br />TOTAL BASE BID $ <br />$5,951,145.00 <br />