Laserfiche WebLink
Item <br />No, <br />Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total Amount <br />60 <br />'WATER SERVICES, 2" <br />EACH <br />1 <br />6.500.00 <br />6,500.00 <br />61 <br />WATER SERVICES, 1" <br />EACH <br />1 <br />3.500.00 <br />3,500.00 <br />62 <br />WATER SERVICES, 3/4" <br />EACH <br />1 <br />3,200.00 <br />3,200.00 <br />63 <br />FIRE SERVICE, 6" <br />EACH <br />2 <br />6,800.00 <br />13,600.00 <br />64 <br />SANITARY SERVICE LATERAL, 10" <br />EACH <br />1 <br />2,700.00 <br />2,700.00 <br />65 <br />SANITARY SERVICE LATERAL, 8" <br />EACH <br />1 <br />11,000.00 <br />11,000.00 <br />66 <br />SANITARY SERVICE LATERAL, 6" <br />EACH <br />4 <br />5,000.00 <br />20,000.00 <br />67 <br />COMPACTED AGGREGATE #53 STONE <br />TON <br />900 <br />31.00 <br />27,900.00 <br />68 <br />#2 STONE <br />TON <br />900 <br />39.00 <br />35,100.00 <br />69 <br />LANDSCAPE EXCAVATION, COMMON <br />CYD <br />173 <br />52.00 <br />8,996.00 <br />70 <br />STORMWATER PIPE, 4" PVC PERFORATED <br />LFT <br />445 <br />31.00 <br />13,795.00 <br />71 <br />DECORATIVE BRICK PAVERS <br />SF <br />4,nf <br />41.00 <br />196,431.00 <br />72 <br />TREE GRATE AND FRAME <br />EACH <br />19 <br />8,000.00 <br />152,000.00 <br />73 <br />CANOPY TREE IN TREE GRATE, 3" <br />EACH <br />19 <br />730.00 <br />13,870.00 <br />74 <br />CANOPY TREE IN LAWN, 3" <br />EACH <br />56 <br />730.00 <br />40,880.00 <br />75 <br />ORNAMENTALTREES <br />EACH <br />11 <br />670.00 <br />7,370.00 <br />76 <br />MEDIUM SHRUB <br />EACH <br />208 <br />66.00 <br />13,728.00 <br />77 <br />PLANTING MIX <br />CYD <br />173 <br />125.00 <br />21,625.00 <br />78 <br />BIKE RACK <br />EACH <br />8 <br />950.00 <br />7,600.00 <br />79 <br />TREE PROTECTION FENCE <br />LFT <br />948 <br />3.50 <br />3,318.00 <br />80 <br />TREE WATERING SYSTEM <br />EACH <br />75 <br />271.60 <br />20,370.00 <br />81 <br />TREE 6 IN., REMOVE <br />EACH <br />9 <br />250.00 <br />2,250.00 <br />82 <br />TREE 10 IN., REMOVE <br />EACH <br />17 <br />500.00 <br />8,500.00 <br />83 <br />TREE 18IN., REMOVE <br />EACH <br />2 <br />1,000.00 <br />2,000.00 <br />84 <br />TREE 30 IN., REMOVE <br />EACH <br />1 <br />2,000.00 <br />2,000.00 <br />85 <br />SUBGRADE TREATMENT, TYPE III <br />SYS <br />10,905 <br />2.00 <br />21,810.00 <br />86 <br />HMA PATCHING FULL DEPTH, TYPE A <br />TON <br />165 <br />320.00 <br />52,800.00 <br />87 <br />HMA PATCHING FULL DEPTH, TYPE C <br />TON <br />68 <br />420.00 <br />28.560.00 <br />88 <br />HMA SURFACE, TYPE C <br />TON <br />520 <br />126.00 <br />65520.00 <br />89 <br />HMA INTERMEDIATE, TYPE C <br />TON <br />860 <br />103.50 <br />89,010.00 <br />90 <br />JOINTADHESIVE <br />LFT <br />4,030 <br />1.90 <br />7,657.00 <br />91 <br />ASPHALT FOR TACK COAT <br />TON <br />7 <br />350.00 <br />2,450.00 <br />92 <br />HMA BASE, TYPE C <br />TON <br />2,965 <br />108.00 <br />320,220.00 <br />93 <br />RAISED PEDESTRIAN CROSSING, PCCP <br />SYS <br />92 <br />280.00 <br />25,760.00 <br />