Laserfiche WebLink
Project Name: <br />f <br />G&T Western Water Main Replacement at Greenlawn Avenue and S. 30th " W" <br />Street'" <br />Project Number: 122-041 <br />For Bids Due: <br />Contractor Name: <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />July 22, 2025 <br />HKP Construction Inc. <br />DIVISION 2 BID: Grand Trunk Western Water Main Renlaramant at Synth ctraor <br />18 <br />Compacted Aggregate, No, 53 <br />5 <br />TON <br />318.00 <br />1,590.00 <br />19 <br />Mulched Seeding, U <br />81 <br />SYS <br />6.00 <br />486.00 <br />20 <br />Topsoil, 2 IN. <br />5 <br />CYS <br />:::3:345.00 <br />1,675.00 <br />21 <br />Line, Thermoplastic, Solid, Yellow, 4 IN. <br />456 <br />LFT <br />1,368.00 <br />22 <br />Line, Thermoplastic, Solid, White, 4 IN, <br />408 <br />LFT <br />3.00 <br />1,224.00 <br />23 <br />Transverse Marking, Thermoplastic, <br />Stop Line, White, 24 IN. <br />92 <br />LFT <br />15.00 <br />1,380.00 <br />24 <br />Pavement Message Marking, <br />Thermoplastic, RXR, 8 FT. <br />2 <br />1,000.00 <br />2,000.00 <br />25 <br />Sign, Sheet, with Legend, 0.100 IN, <br />7 <br />SFT <br />41.00 <br />287.00 <br />26 <br />Sign Post, Type 1, Reinforced Anchor <br />Base <br />42 <br />LFT <br />23.00 <br />966.00 <br />27 <br />Water Main, Ductile Iron, 6 IN. <br />283 <br />LFT <br />350.00 <br />99,050.00 <br />28 <br />Pipe, Steel Casing, Jack and Bore, 12 <br />{N. <br />115 <br />LFT <br />2,139.50 <br />246,042.50 <br />29 <br />6 IN., 45 Degree Bend, Ductile Iron <br />Fitting <br />8 <br />EA <br />1,500.00 <br />12,000.00 <br />30 <br />6 IN. Tee <br />1 <br />EA <br />2,250.00 <br />2,250.00 <br />31 <br />6IN. Cross <br />1 <br />EA <br />0 <br />3,000.00 <br />32 <br />61N. Gate Valve <br />6 <br />EA <br />S3,OOO.00 <br />18,000.00 <br />33 <br />6 IN. Plug <br />4 <br />EA <br />400.00 <br />1,600.00 <br />34 <br />Coupler for Existing Water Main <br />Connection <br />4 <br />1,500.00 <br />6,000.00 <br />35 <br />Pipe Abandonment, Flowable Fill, Non - <br />Removable <br />2 <br />CYS <br />1,085.00 <br />2,170.00 <br />36 <br />Fire Hydrant and Gate Valve Assembly, <br />Remove <br />1 <br />EA <br />3,750.00 <br />3,750.00 <br />Version 07/1912023 Contractor's Bid for Public Works - 10 <br />