Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: G&T Western Water Main Replacement at Greenlawn Avenue and S. 301 <br />Street <br />Project Number: 122-041 <br />For Bids Due: July 22, 2025 <br />Contractor Name: Sel a Construction Co., Inc. <br />DIVISION 2 BID: Grand Trunk Western Water Main Replacement at S30th Street <br />` 18 f Compacted Aggregate, No. 53 <br />5 <br />TON <br />$ 100.00 <br />$ 500.00 <br />19 Mulched Seeding, U <br />� <br />81 <br />SYS <br />$ 140.00 <br />$ 11,340.00 <br />20 Topsoil, 2 IN. <br />5 <br />CYS <br />$ 100.00 <br />$ 500.00 <br />456 <br />LFT <br />$ 4.00 <br />:$ 1,824.00 <br />$ 1,632.00 <br />21 Line, Thermoplastic, Solid, Yellow, 4 IN. <br />22 <br />Line, Thermoplastic, Solid, White, 4 IN. <br />408 <br />LFT <br />$ 4.00 <br />Transverse Marking, Thermoplastic, <br />92 <br />LFT <br />23 <br />Stop Line, White, 24 IN. <br />$ 15.00 <br />$ 1,380.00 <br />24 <br />Pavement Message Marking, <br />2 <br />EA <br />Thermoplastic, RXR, 8 FT. <br />Sign, Sheet, with Legend, 0.100 IN. <br />7 <br />$ 1,000.00 <br />$ 2,000.00 <br />25 <br />SFT <br />$ 41.00 <br />$ 287.00 <br />26 <br />Sign Post, Type 1, Reinforced Anchor <br />42 <br />LFT <br />Base <br />$ 23.00 <br />$ 966.00 <br />27 <br />Water Main, Ductile Iron, 6 IN. <br />283 <br />LFT <br />$ 430.00 <br />$ 121,690.00 <br />28 Pipe, Steel Casing, Jack and Bore, 12 115 <br />IN. <br />29 6 IN., 45 Degree Bend, Ductile Iron 8 <br />Fitting <br />30 6 IN. Tee 1 <br />31 <br />6 IN. Cross I 1 <br />1 <br />32 <br />6 IN. Gate Valve <br />_ <br />6 <br />33 <br />6 IN. Plug <br />4 <br />34 <br />Coupler for Existing Water Main <br />4 <br />Connection <br />35 <br />Pipe Abandonment, Flowable Fill, Non- <br />2 <br />Removable <br />Fire Hydrant and Gate Valve Assembly, <br />1 <br />36 <br />Remove <br />LFT <br />$ 2,964.00 <br />$ 340,860.00 <br />EA $ 840.00 <br />;$ 6,720.00 <br />EA $ 1,000.00 <br />$ 1, 000.00 <br />EA <br />$ 1,500.00 <br />$ 1,500.00 <br />EA <br />$ 2,960.00 <br />$ 17,760.00 <br />EA <br />$ 680.00 <br />$ 2,720.00 <br />EA <br />$ 1,300.00 <br />$ 5,200.00 <br />CYS <br />$ 200.00 <br />$ 400.00 <br />i <br />EA $ 250.00 <br />$ 250.00 <br />Version 07/19/2023 Contractor's Bid for Public Works - 10 <br />