My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bid & Award- Center City Place Rehabilitation Proj No 125-022 - Slatile Roofing and Sheet Metal Co., Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bid & Award- Center City Place Rehabilitation Proj No 125-022 - Slatile Roofing and Sheet Metal Co., Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 11:29:59 AM
Creation date
7/23/2025 11:28:17 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
°6. Do you intend to do the grading on the proposed work with your own forces?_:--- NO <br />If so, give type of equipment to be <br />°7. If you intend to sublet the grading or perform it through an agent, state amount of sub -contract or agent's <br />contract, and, if known, the name and address of sub -contractor or agent, amount and type of his equipment. and <br />financial responsibility____ N/A---- <br />8. Do you intend to sublet any other portions of the work? SEE BELOW _ If so, state amount <br />of sub -contract, and, if known, the name and address of the sub -contractor, amount, and type of his equipment <br />and financial responsibility ALL ROOFING AND MASONRY WORK SHALL BE PERFORMED IN HOUSE. <br />ALL OTHER WORK WILL BE PERFORMED AS STATED IN PROPOSAL AGREEMENT OR AS AGREED <br />__ <br />UPON DURING PRECONSTRUCTIO_N MEETINGS. ALL SUBCONTRACTOR AGREEMENTS SHALL _ <br />REMAIN CONFIDENTIAL UNLESS AGREED UPON OTHERWISE BY CONTRACTOR AND-� <br />SUBCONTRACTOR OR OTHERWISE SPECIFIED IN CONTRACT DOCUMENTS <br />9. From which sub -contractors or agents do you expect to require a bond? N/A <br />10. What equipment do you own that is available for the proposed work? <br />QUANTITY <br />ITEM <br />DESCRIPTION. SIZE, <br />CAPACITY. ETC. <br />CONDITION <br />YEARS OF <br />SERVICE <br />PRESENT LOCATION <br />4 <br />---- -- - - - <br />MOBILE CRANE <br />-----•------------------ <br />I <br />OPERATIONAL <br />2 <br />- ----- - <br />---------- <br />SCISSOR BED TRU <br />----_----------------•-----------•------ <br />KS <br />--•-------••---A-- <br />OPERATIONAL <br />-------- ----- <br />---------- —•------------------- •-------- ----.. <br />17 <br />/2 ----- -- -1 • ---••-- <br />1/2 TON - 1 TON <br />- - ---- ----------------------- <br />TRUCKS <br />----•----•-........- <br />OPERATIONAL <br />•------------- <br />------------------------------•------------- <br />1 <br />-- - <br />DUMP TRUCK <br />- - - ---•--- __R---------------- <br />OPERATIONAL <br />VARIOUS ROOFIN <br />-•-------•----------•------------------- <br />AND MASONRY <br />----------_•-------- <br />OPERATIONAL <br />---•---------- <br />---------------------------------------------- <br />_ _ ------ <br />_ EQUIPMENT <br />- ---- -•---•---• <br />OPERATIONAL <br />6 <br />COIL METAL ROO <br />- ---- ------- -- ---------•- <br />ING FAB MACHINES <br />---------•--•--•-- <br />OPERATIONAL <br />-- --- <br />- ---------------------------------- <br />----- ---- -- <br />COMPLETE SHEETMETAL <br />-- - _--------------•-- <br />FAB SHOP <br />OPERATIONAL <br />----.--- ---- <br />MASONRY RESTO <br />--- -------------------------- -..... <br />----------------• -- - -------------- <br />A ---ON EQUIP <br />_...-....... -------- - ----- - <br />-•--•---•---------- <br />OPERATIONAL <br />------------------I <br />----------- -- <br />---------- <br />----•--------------------------------------- <br />------- ------ ----- - <br />
The URL can be used to link to this page
Your browser does not support the video tag.