My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Milkweed Commons Roof Replacements Proj No 125-021B - Reliable Roofing and Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Milkweed Commons Roof Replacements Proj No 125-021B - Reliable Roofing and Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 11:27:21 AM
Creation date
7/23/2025 11:25:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
# Services <br />Qty Price Total <br />252 LF of clay coping @ $30/LF = $7,560 <br />Lift rental for framing/truss repairs = $3,500 <br />Structural reinforcement allowance (per Bid Div. B) _ $8,000 <br />Masonry/flashing integration allowance (per Bid Div. B) _ $5,000 <br />Cost Breakdown: <br />OSB Decking Replacement (114 @ $120) _ $13,680 - <br />TPO Roofing System (4,500 sq. ft. @ $20/sq. ft.) _ $90,000 <br />Truss Reinforcement Allowance = $35,000 <br />Scupper Boxes & Downspouts = $6,000 <br />Roof Hatch & Ladder = $4,500 <br />Clay Coping = $7,560 <br />Lift Rental = $3,500 <br />Structural Reinforcement Allowance = $8,000 <br />Masonry Integration Allowance = $5,000 <br />Base Bid Total: $173,240.00 <br />Note: Truss raising not included. If required, estimated cost is $800/truss + $350 materials per truss. <br />3 Roof Area 2 — Skylight System Replacement 1.00 $28,520.00 $28,520.00 <br />Scope of Work: <br />Remove existing corrugated skylight panels and damaged framing <br />Reinforce skylight -supporting beams per structural engineer recommendations <br />Frame new skylight structure using treated lumber: <br />46 treated 2x4s for framing <br />32 treated 2x4s for purlins <br />Treated fascia included for perimeter tie-in <br />Install 18 double -wall polycarbonate panels (32 sq. ft. each) <br />Install H-channel flashing between panels and seal with recommended adhesives <br />Tie into TPO membrane system (Roof Area 1) with full waterproofing <br />Coordinate with south -to -north cricket drainage <br />Includes weather protection, equipment, and cleanup <br />Material & Labor Cost Breakdown: <br />Polycarbonate Panels (18 @ $129.99) _ $2,339.82 <br />H-Channel Flashing = $300.00 <br />Treated 2x4s for Framing (46 @ $4.58) _ $210.68 <br />Treated 2x4s for Purlins (32 @ $4.58) _ $146.56 <br />Treated Fascia = $250.00 <br />Fasteners, Adhesives, Sealants = $250.00 <br />Labor (3-day install crew) _ $5,400.00 <br />Lift Rental (shared use) _ $1,000.00 <br />Cleanup & Protection = $200.00 <br />Subtotal Cost Basis = $10,096.06 <br />Actual Internal Cost Estimate = $24,800.00 <br />Markup (15%) _ $3,720.00 <br />Final Bid Line Item = $28,520.00 <br />Note: Structural reinforcement covered under $8,000 Division B allowance. This line item does not include truss <br />leveling (Roof Area 1). <br />4 Line Item: Roof Area 3 — Rear Addition Roof Replacement 1.00 $97,175.00 $97,175.00 <br />Scope of Work: <br />Remove existing roof membrane and stone ballast over entire 2,100 sq. ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.