My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Plans for the O'Brien Park Splashpad and Restroom Proj No 125-025 - Abonmarche
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Plans for the O'Brien Park Splashpad and Restroom Proj No 125-025 - Abonmarche
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 3:01:45 PM
Creation date
7/22/2025 3:00:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Abonmarche Consultants, Inc. <br />315 W. Jefferson Blvd. <br />South Bend, IN 46601 <br />City of South Bend <br />O'Brien Park Improvements <br />DESCRIPTION <br />STAFFHOURS BY CLASSIFICATION <br />Total Hours <br />Total Cost <br />Principal <br />Project <br />Manager <br />Project <br />Engineer <br />Staff <br />Engineer <br />CAD Tech <br />Admin <br />Civil Preliminary Design <br />Develop Two Site Layout Concepts <br />5 <br />5 <br />Coordination with Splashpad Manufacturer/Designer <br />2 <br />2 <br />Coordination with Playground Manufacturer/Designer <br />2 <br />2 <br />Coordination with City for Asbuilts/Utility Connections <br />4 <br />4 <br />Site Layout Cost Estimates (2) <br />4 <br />4 <br />Meeting with Client - Decision on Concepts <br />1 <br />1 <br />Civil 307. Plans <br />0 <br />Site Layout Plan <br />2 <br />2 <br />Grading Design / Plan <br />4 <br />4 <br />Drainage Design / Plan <br />4 <br />4 <br />Utility Connection Design / Plan <br />4 <br />4 <br />Stormwater Pollution Prevention Plan <br />1 <br />1 <br />Landscape Plan <br />1 <br />1 <br />Lighting Plan <br />3 <br />3 <br />Coordination with Splashpad Manufacturer/Designer <br />2 <br />3 <br />5 <br />Coordination with Splashpad Manufacturer/Designer <br />2 <br />2 <br />30% Design Cost Estimate <br />4 <br />4 <br />Internal QA/QC Plan/Estimate Review <br />0 <br />Meet with Client on 30% Plan Deliverable <br />1 <br />1 <br />2 <br />Total Hours <br />1 <br />0 <br />42 <br />7 <br />50 <br />Cost per Hour <br />$250.00 <br />$200.00 <br />$100.00 <br />$85.00 <br />Total Cost by Classification <br />$250.00 <br />$0.00 <br />$4,200.00 <br />$595.00 <br />$ 5,045.00 <br />Civil/Utility Engineering Total <br />Budget <br />$5,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.