Laserfiche WebLink
BASE BID <br />Item No. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />BID TABULATION <br />2025 Contractor Paving Round 2 <br />Project No: 125-034 <br />For Bids Due: July 8, 2025 <br />ription Quantity Unit <br />ization and Demobilization <br />1 <br />LS <br />enance of Traffic <br />1 <br />LS <br />1, 2" <br />8,500 <br />SY <br />3, 4" <br />66,000 <br />SY <br />Surface, 9.5 mm -Type B, PG 58S-28 <br />3,500 <br />TON <br />Surface, 9.5 mm - Type C, PG 58H-28 <br />2,850 <br />TON <br />Intermediate. 19 mm -TVDe B. PG58S-28 <br />9.000 <br />1 TON <br />Coat <br />55 <br />1 TON <br />Adhesive, Surface <br />33,000 <br />LFT <br />;t Manhole to Grade <br />2 <br />EA <br />;t Inlet to Grade <br />7 <br />EA <br />;t Valve to Grade <br />2 <br />EA <br />sh and Replace Casting <br />3 <br />EA <br />it Cable, Roadway Loop, Copper, 1 C/14 GA <br />2,210 <br />1 LFT <br />Cut for Roadway Loop Detector and Sealant <br />737 <br />LFT <br />Thermoplastic, Solid, White, 4 IN <br />1922, <br />LFT <br />Thermoplastic, Solid, Yellow, 4 IN <br />13,784 <br />LFT <br />Thermoplastic, Broken, Yellow, 4 IN <br />780 <br />LFT <br />Thermoplastic, Solid, Yellow, 8 IN <br />440 <br />LFT <br />Marking, Thermoplastic, Crosswalk Line, White, 61N 2,388 1 LFT <br />Marking, Thermoplastic, Crosshatch Line, Yellow, 12 IN 122 LFT <br />Marking, Thermoplastic, White, Stop Line, 24 IN 394 LFT <br />Message Marking, Thermoplastic, Lane Indication Arrow 24 EA <br />Message Marking, Thermoplastic, ONLY 4 EA <br />Message Marking, Thermoplastic, Shared Lane 9 EA <br />rate Speed Hump <br />2 <br />1 EA <br />d Hump Sign <br />2 <br />EA <br />Contrast Chevron Pavement Marking Set <br />4 <br />EA <br />nced Warning Marking Set <br />4 <br />EA <br />rate Curb Ramp, Removal <br />500 <br />SY <br />rate Curb Ramp, Installation <br />475 <br />SY <br />Concrete, Remove <br />BASE BID TOTAL <br />90 1 LFT <br />Enginner Estimate <br />Unit Price Item Total <br />Rieth Riley Construction Co., <br />Inc <br />Unit Price Item Total <br />Milestone Contractors, <br />Unit Price <br />L.P. <br />Item Total <br />$75,000.00 <br />$ 75,000.00 <br />$ 45,400.23 <br />$ 45,400.23 <br />$ 121,000.00 <br />$ 121,000.00 <br />$50,000.00 <br />$ 50,000.00 <br />$ 73,593.46 <br />$ 73,593.46 <br />$ 117,237.20 <br />$ 117,237.20 <br />$3.00 <br />$ 25,500.00 <br />$ 4.58 <br />$ 38,930.00 <br />$ 4.95 <br />$ 42,075.00 <br />$4.00 <br />$ 264,000.00 <br />$ 4.22 <br />$ 278,520.00 <br />$ 4.40 <br />$ 290,400.00 <br />$99.00 <br />$ 346,500.00 <br />$ 98.41 <br />$ 344,435.00 <br />$ 95.00 <br />$ 332,500.00 <br />$102.00 <br />$ 290,700.00 <br />$ 98.10 <br />$ 279,585.00 <br />$ 100.00 <br />$ 285,000.00 <br />$92.00 <br />1 $ 828,000.00 <br />$ 82.61 <br />$ 743,490.00 <br />$ 80.00 <br />$ 720,000.00 <br />$150.00 <br />$ 30,000.00 <br />$ 238.68 <br />$ 47,736.00 <br />$ 150.00 <br />$ 30,000.00 <br />$1.00 <br />$ 55.00 <br />$ 674.57 <br />$ 37,101.35 <br />$ 0.10 <br />$ 5.50 <br />$0.40 <br />$ 13,200.00 <br />$ 0.58 <br />$ 19,140.00 <br />$ 0.10 <br />$ 3,300.00 <br />$900.00 <br />$ 1,800.00 <br />$ 765.15 <br />$ 1,530.30 <br />$ 1,240.00 <br />$ 2,480.00 <br />$1000.00 <br />$ 7,000.00 <br />$ 765.15 <br />$ 5,356.05 <br />$ 1,240.00 <br />$ 8,680.00 <br />$150.00 <br />$ 300.00 <br />$ 382.58 <br />$ 765.16 <br />$ 380.00 <br />$ 760.00 <br />$2500.00 <br />$ 7,500.00 <br />$ 1,464.05 <br />$ 4,392.15 <br />$ 1,930.00 <br />$ 5,790.00 <br />$500.00 <br />$ 1,000.00 <br />$ 353.65 <br />$ 707.30 <br />$ 353.65 <br />$ 707.30 <br />$1200.00 <br />$ 2,400.00 <br />$ 1,700.45 <br />$ 3,400.90 <br />$ 1,700.45 <br />$ 3,400.90 <br />$0.70 <br />$ 1,547.00 <br />$ 1.04 <br />$ 2,298.40 <br />$ 1.04 <br />$ 2,298.40 <br />$10.00 <br />$ 7,370.00 <br />$ 15.67 <br />$ 11,548.79 <br />$ 15.67 <br />$ 11,548.79 <br />$2.00 <br />$ 3,844.00 <br />$ 1.00 <br />$ 1,922.00 <br />$ 1.00 <br />$ 1,922.00 <br />$2.00 <br />$ 27,568.00 <br />$ 1.00 <br />$ 13,784.00 <br />$ 1.00 <br />$ 13,784.00 <br />$2.00 <br />$ 1,560.00 <br />$ 1.00 <br />$ 780.00 <br />$ 1.00 <br />$ 780.00 <br />$4.00 <br />$ 1,760.00 <br />$ 3.00 <br />$ 1,320.00 <br />$ 3.00 <br />$ 1,320.00 <br />$15.00 <br />$ 5,625.00 <br />$ 15.00 <br />$ 5,625.00 <br />$ 15.00 <br />$ 5,625.00 <br />$4.00 <br />$ 56.00 <br />$ 10.00 <br />$ 140.00 <br />$ 10.00 <br />$ 140.00 <br />$6.00 <br />$ 14,328.00 <br />$ 7.00 <br />$ 16,716.00 <br />$ 7.00 <br />$ 16,716.00 <br />$4.00 <br />$ 488.00 <br />$ 10.00 <br />$ 1,220.00 <br />$ 10.00 <br />$ 1,220.00 <br />$15.00 <br />$ 5,910.00 <br />$ 15.00 <br />$ 5,910.00 <br />$ 15.00 <br />$ 5,910.00 <br />$200.00 <br />$ 4,800.00 <br />$ 200.00 <br />$ 4,800.00 <br />$ 200.00 <br />$ 4,800.00 <br />$200.00 <br />$ 800.00 <br />$ 250.00 <br />$ 1,000.00 <br />$ 250.00 <br />$ 1,000.00 <br />$200.00 <br />$ 1,800.00 <br />$ 400.00 <br />$ 3,600.00 <br />$ 400.00 <br />$ 3,600.00 <br />$1.00 <br />$ 17,366.00 <br />$ 1.00 <br />$ 17,366.00 <br />$ 1.00 <br />$ 17,366.00 <br />$150.00 <br />$ 750.00 <br />$ 358.39 <br />$ 1,791.95 <br />$ 358.39 <br />$ 1,791.95 <br />$20000.00 <br />$ 40,000.00 <br />$ 19,667.10 <br />$ 39,334.20 <br />$ 16,380.00 <br />$ 32,760.00 <br />$150.00 <br />$ 300.00 <br />$ 373.43 <br />$ 746.86 <br />$ 373.48 <br />$ 746.96 <br />$1500.00 <br />$ 6,000.00 <br />$ 1,000.00 <br />$ 4,000.00 <br />$ 1,000.00 <br />$ 4,000.00 <br />$500.00 <br />$ 2,000.00 <br />$ 500.00 <br />$ 2,000.00 <br />$ 500.00 <br />$ 2,000.00 <br />$50.00 <br />$ 25,000.00 <br />$ 60.85 <br />$ 30,425.00 <br />$ 66.00 <br />$ 33,000.00 <br />$250.00 <br />$ 118,750.00 <br />$ 185.37 <br />$ 88,050.75 <br />$ 289.00 <br />$ 137,275.00 <br />$150.00 <br />$ 15,000.00 <br />$ 48.96 <br />$ 4,896.00 <br />$ 111.00 <br />$ 11,100.00 <br />$200.00 <br />$ 600.00 <br />$ 375.00 <br />$ 1,125.00 <br />$ 375.00 <br />$ 1,125.00 <br />$75.00 <br />$ 6,750.00 <br />$ 49.66 <br />$ 4,469.40 <br />$ 14.00 <br />$ 1,260.00 <br />$50.00 <br />$ 2,250.00 <br />$ 165.33 <br />$ 7,439.85 <br />$ 35.00 <br />$ 1,575.00 <br />$ 2,255,177.00 <br />$ 2,196,392.10 <br />$ 2,278,000.00 <br />Non -Collusion Affadavit <br />Y <br />Y <br />Addendum #1 <br />Y <br />Y <br />Addendum #2 <br />N/A <br />N/A <br />I hereby certify that the above truly and accurately represents bids received for this project on July 9, 2025 <br />Daniel Jones, Senior 0ect Engineer <br />Page 1 of 1 <br />