BASE BID
<br />Item No.
<br />1
<br />2
<br />3
<br />4
<br />5
<br />6
<br />7
<br />8
<br />9
<br />10
<br />11
<br />12
<br />13
<br />14
<br />15
<br />16
<br />17
<br />18
<br />19
<br />20
<br />21
<br />22
<br />23
<br />24
<br />25
<br />26
<br />27
<br />28
<br />29
<br />30
<br />31
<br />32
<br />33
<br />34
<br />35
<br />36
<br />37
<br />38
<br />39
<br />40
<br />41
<br />42
<br />BID TABULATION
<br />2025 Contractor Paving Round 2
<br />Project No: 125-034
<br />For Bids Due: July 8, 2025
<br />ription Quantity Unit
<br />ization and Demobilization
<br />1
<br />LS
<br />enance of Traffic
<br />1
<br />LS
<br />1, 2"
<br />8,500
<br />SY
<br />3, 4"
<br />66,000
<br />SY
<br />Surface, 9.5 mm -Type B, PG 58S-28
<br />3,500
<br />TON
<br />Surface, 9.5 mm - Type C, PG 58H-28
<br />2,850
<br />TON
<br />Intermediate. 19 mm -TVDe B. PG58S-28
<br />9.000
<br />1 TON
<br />Coat
<br />55
<br />1 TON
<br />Adhesive, Surface
<br />33,000
<br />LFT
<br />;t Manhole to Grade
<br />2
<br />EA
<br />;t Inlet to Grade
<br />7
<br />EA
<br />;t Valve to Grade
<br />2
<br />EA
<br />sh and Replace Casting
<br />3
<br />EA
<br />it Cable, Roadway Loop, Copper, 1 C/14 GA
<br />2,210
<br />1 LFT
<br />Cut for Roadway Loop Detector and Sealant
<br />737
<br />LFT
<br />Thermoplastic, Solid, White, 4 IN
<br />1922,
<br />LFT
<br />Thermoplastic, Solid, Yellow, 4 IN
<br />13,784
<br />LFT
<br />Thermoplastic, Broken, Yellow, 4 IN
<br />780
<br />LFT
<br />Thermoplastic, Solid, Yellow, 8 IN
<br />440
<br />LFT
<br />Marking, Thermoplastic, Crosswalk Line, White, 61N 2,388 1 LFT
<br />Marking, Thermoplastic, Crosshatch Line, Yellow, 12 IN 122 LFT
<br />Marking, Thermoplastic, White, Stop Line, 24 IN 394 LFT
<br />Message Marking, Thermoplastic, Lane Indication Arrow 24 EA
<br />Message Marking, Thermoplastic, ONLY 4 EA
<br />Message Marking, Thermoplastic, Shared Lane 9 EA
<br />rate Speed Hump
<br />2
<br />1 EA
<br />d Hump Sign
<br />2
<br />EA
<br />Contrast Chevron Pavement Marking Set
<br />4
<br />EA
<br />nced Warning Marking Set
<br />4
<br />EA
<br />rate Curb Ramp, Removal
<br />500
<br />SY
<br />rate Curb Ramp, Installation
<br />475
<br />SY
<br />Concrete, Remove
<br />BASE BID TOTAL
<br />90 1 LFT
<br />Enginner Estimate
<br />Unit Price Item Total
<br />Rieth Riley Construction Co.,
<br />Inc
<br />Unit Price Item Total
<br />Milestone Contractors,
<br />Unit Price
<br />L.P.
<br />Item Total
<br />$75,000.00
<br />$ 75,000.00
<br />$ 45,400.23
<br />$ 45,400.23
<br />$ 121,000.00
<br />$ 121,000.00
<br />$50,000.00
<br />$ 50,000.00
<br />$ 73,593.46
<br />$ 73,593.46
<br />$ 117,237.20
<br />$ 117,237.20
<br />$3.00
<br />$ 25,500.00
<br />$ 4.58
<br />$ 38,930.00
<br />$ 4.95
<br />$ 42,075.00
<br />$4.00
<br />$ 264,000.00
<br />$ 4.22
<br />$ 278,520.00
<br />$ 4.40
<br />$ 290,400.00
<br />$99.00
<br />$ 346,500.00
<br />$ 98.41
<br />$ 344,435.00
<br />$ 95.00
<br />$ 332,500.00
<br />$102.00
<br />$ 290,700.00
<br />$ 98.10
<br />$ 279,585.00
<br />$ 100.00
<br />$ 285,000.00
<br />$92.00
<br />1 $ 828,000.00
<br />$ 82.61
<br />$ 743,490.00
<br />$ 80.00
<br />$ 720,000.00
<br />$150.00
<br />$ 30,000.00
<br />$ 238.68
<br />$ 47,736.00
<br />$ 150.00
<br />$ 30,000.00
<br />$1.00
<br />$ 55.00
<br />$ 674.57
<br />$ 37,101.35
<br />$ 0.10
<br />$ 5.50
<br />$0.40
<br />$ 13,200.00
<br />$ 0.58
<br />$ 19,140.00
<br />$ 0.10
<br />$ 3,300.00
<br />$900.00
<br />$ 1,800.00
<br />$ 765.15
<br />$ 1,530.30
<br />$ 1,240.00
<br />$ 2,480.00
<br />$1000.00
<br />$ 7,000.00
<br />$ 765.15
<br />$ 5,356.05
<br />$ 1,240.00
<br />$ 8,680.00
<br />$150.00
<br />$ 300.00
<br />$ 382.58
<br />$ 765.16
<br />$ 380.00
<br />$ 760.00
<br />$2500.00
<br />$ 7,500.00
<br />$ 1,464.05
<br />$ 4,392.15
<br />$ 1,930.00
<br />$ 5,790.00
<br />$500.00
<br />$ 1,000.00
<br />$ 353.65
<br />$ 707.30
<br />$ 353.65
<br />$ 707.30
<br />$1200.00
<br />$ 2,400.00
<br />$ 1,700.45
<br />$ 3,400.90
<br />$ 1,700.45
<br />$ 3,400.90
<br />$0.70
<br />$ 1,547.00
<br />$ 1.04
<br />$ 2,298.40
<br />$ 1.04
<br />$ 2,298.40
<br />$10.00
<br />$ 7,370.00
<br />$ 15.67
<br />$ 11,548.79
<br />$ 15.67
<br />$ 11,548.79
<br />$2.00
<br />$ 3,844.00
<br />$ 1.00
<br />$ 1,922.00
<br />$ 1.00
<br />$ 1,922.00
<br />$2.00
<br />$ 27,568.00
<br />$ 1.00
<br />$ 13,784.00
<br />$ 1.00
<br />$ 13,784.00
<br />$2.00
<br />$ 1,560.00
<br />$ 1.00
<br />$ 780.00
<br />$ 1.00
<br />$ 780.00
<br />$4.00
<br />$ 1,760.00
<br />$ 3.00
<br />$ 1,320.00
<br />$ 3.00
<br />$ 1,320.00
<br />$15.00
<br />$ 5,625.00
<br />$ 15.00
<br />$ 5,625.00
<br />$ 15.00
<br />$ 5,625.00
<br />$4.00
<br />$ 56.00
<br />$ 10.00
<br />$ 140.00
<br />$ 10.00
<br />$ 140.00
<br />$6.00
<br />$ 14,328.00
<br />$ 7.00
<br />$ 16,716.00
<br />$ 7.00
<br />$ 16,716.00
<br />$4.00
<br />$ 488.00
<br />$ 10.00
<br />$ 1,220.00
<br />$ 10.00
<br />$ 1,220.00
<br />$15.00
<br />$ 5,910.00
<br />$ 15.00
<br />$ 5,910.00
<br />$ 15.00
<br />$ 5,910.00
<br />$200.00
<br />$ 4,800.00
<br />$ 200.00
<br />$ 4,800.00
<br />$ 200.00
<br />$ 4,800.00
<br />$200.00
<br />$ 800.00
<br />$ 250.00
<br />$ 1,000.00
<br />$ 250.00
<br />$ 1,000.00
<br />$200.00
<br />$ 1,800.00
<br />$ 400.00
<br />$ 3,600.00
<br />$ 400.00
<br />$ 3,600.00
<br />$1.00
<br />$ 17,366.00
<br />$ 1.00
<br />$ 17,366.00
<br />$ 1.00
<br />$ 17,366.00
<br />$150.00
<br />$ 750.00
<br />$ 358.39
<br />$ 1,791.95
<br />$ 358.39
<br />$ 1,791.95
<br />$20000.00
<br />$ 40,000.00
<br />$ 19,667.10
<br />$ 39,334.20
<br />$ 16,380.00
<br />$ 32,760.00
<br />$150.00
<br />$ 300.00
<br />$ 373.43
<br />$ 746.86
<br />$ 373.48
<br />$ 746.96
<br />$1500.00
<br />$ 6,000.00
<br />$ 1,000.00
<br />$ 4,000.00
<br />$ 1,000.00
<br />$ 4,000.00
<br />$500.00
<br />$ 2,000.00
<br />$ 500.00
<br />$ 2,000.00
<br />$ 500.00
<br />$ 2,000.00
<br />$50.00
<br />$ 25,000.00
<br />$ 60.85
<br />$ 30,425.00
<br />$ 66.00
<br />$ 33,000.00
<br />$250.00
<br />$ 118,750.00
<br />$ 185.37
<br />$ 88,050.75
<br />$ 289.00
<br />$ 137,275.00
<br />$150.00
<br />$ 15,000.00
<br />$ 48.96
<br />$ 4,896.00
<br />$ 111.00
<br />$ 11,100.00
<br />$200.00
<br />$ 600.00
<br />$ 375.00
<br />$ 1,125.00
<br />$ 375.00
<br />$ 1,125.00
<br />$75.00
<br />$ 6,750.00
<br />$ 49.66
<br />$ 4,469.40
<br />$ 14.00
<br />$ 1,260.00
<br />$50.00
<br />$ 2,250.00
<br />$ 165.33
<br />$ 7,439.85
<br />$ 35.00
<br />$ 1,575.00
<br />$ 2,255,177.00
<br />$ 2,196,392.10
<br />$ 2,278,000.00
<br />Non -Collusion Affadavit
<br />Y
<br />Y
<br />Addendum #1
<br />Y
<br />Y
<br />Addendum #2
<br />N/A
<br />N/A
<br />I hereby certify that the above truly and accurately represents bids received for this project on July 9, 2025
<br />Daniel Jones, Senior 0ect Engineer
<br />Page 1 of 1
<br />
|