My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:56:29 PM
Creation date
7/22/2025 2:55:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
# <br />Service Area/Item Description <br />BASIC <br />ADDITIONAL SYSTEM <br />Verify unit is grounded in accordance with <br />SYSTEM <br />SERVICES <br />manufacturer's instructions <br />Meteorological Station, Alignment <br />13.8 <br />Inspect weather station and all sensors for proper <br />Annually <br />alignment. Realign sensors as required. <br />Meteorological Station, Housing <br />13.9 <br />Inspect instrument housings and base supports for <br />Annually <br />evidence of corrosion or damage <br />Meteorological Station, Cleaning <br />13.1 <br />Clean pyranometers and irradiance sensors with <br />Annually <br />isopropyl alcohol and lint -free cloth. <br />Meteorological Station, Desiccant <br />13.1 <br />Check desiccant of pyranometer drying cartridge <br />Annually <br />and replace if necessary <br />Medium -Voltage Transformers, Switchgear and Protection Devices — Exclusive to front of the <br />14 <br />meter installations only, where MV gear is specific to the solar or BESS project. <br />Transformer, Enclosure <br />14.1 <br />Inspect enclosure and devices for corrosion, heat <br />N/A <br />distortion, moisture entry, insect and rodent <br />infestation, and exterior damage. <br />Transformer, Signage <br />14.2 <br />N/A <br />Confirm that all Signage and labeling are in place <br />Transformer, Anchorage <br />14.3 <br />Inspect structural mounting pad, anchorage and <br />N/A <br />alignment <br />Transformer, Bushings <br />14.4 <br />N/A <br />Inspect bushings <br />Transformer, IR <br />14.5 <br />Perform thermographic survey of all field <br />N/A <br />terminations visually available from the opening of <br />the cabinet <br />Transformer, Tap -changer. <br />14.6 <br />N/A <br />Verify tap -changer position is set as specified <br />Transformer, Measurements <br />14.7 <br />Check and record high -temperature pressure and <br />N/A <br />fluid level <br />Transformer, Fluid and Gas Analysis <br />Confidential & Proprietary Information of Ameresco, Inc. Page 54 of 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.