Laserfiche WebLink
This is EXHIBIT K, consisting of 2 pages, referred to in and <br />part of the Agreement between Owner and Engineer for <br />Professional Services dated Dec 12, 2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. _9 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: Dec 12, 2017 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: SmithGroup Inc. (Formerly SmithGroupJJR Inc.) <br />d. Project: Seitz Park Reconstruction, South Bend Project No. 117-093 <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) The scope of services is for updating and finalizing Phase II construction bid <br />documents (drawings and specifications) (Task 5) based on a bid date of October 24, <br />2025 (documents completion), permitting, and bid and award services. <br />2) The scope of services to include updates to the original Phase II design work using <br />the prior bid documents for Phase II dated October 25, 2021 as the basis of design as <br />follows: <br />a) Review and validate the structural detailing for the pile supported ramps, <br />platforms, and walkways. <br />b) Additional topographic survey under E. Jefferson Blvd. Bridge and south of <br />bridge in expanded work limits. <br />c) Review and validate the floating dock and gangway detailing (originally bid in <br />Phase I documents, but not installed). <br />d) Provide structural engineering design for the north side E. Jefferson Blvd. bridge <br />stair in lieu of delegated design including the addition of the guardrail and railings <br />to utilize the same design detailing as Phase I guardrails. <br />e) Extension of project boundary to the north of the existing project boundary <br />approximately 50' to include concrete sidewalk removal and replacement <br />adjacent to the East Race. <br />f) Validate and update the following based on Phase I construction administration <br />observations: guardrails, deck topping, south Jefferson Blvd. stair, widening of <br />platform over East Race bridge (no headwalls included), landscape palette, and <br />site furnishings. <br />g) Include new lighting under the E. Jefferson Blvd. bridge. <br />h) All other items from previous bid documents remain as designed. <br />3) Permitting: <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />