My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 9 to PSA Seitz Park Phase II Proj No 125-041 - SmithGroup, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 9 to PSA Seitz Park Phase II Proj No 125-041 - SmithGroup, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:54:27 PM
Creation date
7/22/2025 2:54:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in and <br />part of the Agreement between Owner and Engineer for <br />Professional Services dated Dec 12, 2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. _9 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: Dec 12, 2017 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: SmithGroup Inc. (Formerly SmithGroupJJR Inc.) <br />d. Project: Seitz Park Reconstruction, South Bend Project No. 117-093 <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) The scope of services is for updating and finalizing Phase II construction bid <br />documents (drawings and specifications) (Task 5) based on a bid date of October 24, <br />2025 (documents completion), permitting, and bid and award services. <br />2) The scope of services to include updates to the original Phase II design work using <br />the prior bid documents for Phase II dated October 25, 2021 as the basis of design as <br />follows: <br />a) Review and validate the structural detailing for the pile supported ramps, <br />platforms, and walkways. <br />b) Additional topographic survey under E. Jefferson Blvd. Bridge and south of <br />bridge in expanded work limits. <br />c) Review and validate the floating dock and gangway detailing (originally bid in <br />Phase I documents, but not installed). <br />d) Provide structural engineering design for the north side E. Jefferson Blvd. bridge <br />stair in lieu of delegated design including the addition of the guardrail and railings <br />to utilize the same design detailing as Phase I guardrails. <br />e) Extension of project boundary to the north of the existing project boundary <br />approximately 50' to include concrete sidewalk removal and replacement <br />adjacent to the East Race. <br />f) Validate and update the following based on Phase I construction administration <br />observations: guardrails, deck topping, south Jefferson Blvd. stair, widening of <br />platform over East Race bridge (no headwalls included), landscape palette, and <br />site furnishings. <br />g) Include new lighting under the E. Jefferson Blvd. bridge. <br />h) All other items from previous bid documents remain as designed. <br />3) Permitting: <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.