IL1
<br />to " I '` r m na
<br />i
<br />INDIANAPOLIS, IN March 14, 2025
<br />TO
<br />RIETH-RILEY CONSTRUCTION CO., INC.
<br />who has filed with the C
<br />required under Indiana
<br />le@ing 1n Masses of W
<br />below, for such period a
<br />the financial condition
<br />10, Is hereby qualified to
<br />in the amount and other
<br />ileted work on [land from,
<br />by name or ssyymbol are
<br />:arid Financial Condition.
<br />revlslon or revocation at
<br />ntracting firm or other f
<br />Valid March 14, 2025 Thru July 31, 2025
<br />GOSHEN, IN
<br />se and I'irtancial Condition as
<br />as
<br />s any cersncate
<br />when changes
<br />or revocation.
<br />Aggregate Bidding Capacity: _ 2,105,810,000.(
<br />0085 CLEAN AND SEAL CRACKS/JOINTS IN PCCPlHMA PVMT..........................................
<br />$10,000,000.00
<br />0135 EARTH RETENTION SYSTEMS: GENERAL....................................................................
<br />$10,000,000.00
<br />0155 TEMPORARY EROSIONAND SEDIMENT CONTROL ....................................................
<br />$10,000,000.00
<br />0250 DRIVEN PILING.................................................................................................................
<br />$10,000,000.00
<br />0333 SOUND BARRIER WALL INSTALLATION........................................................................
<br />$10,000,000.00
<br />0400 WATERAND WASTEWATER TREATMENT SYSTEMS ...................................................
<br />$20,000,000.00
<br />A(A) CONCRETE PAVEMENT: GENERAL................................................................................
<br />$99,999,999.00
<br />B(A) ASPHALT PAVEMENT:W/INDOT CERTIFIED HMA PLANT...................................
<br />..... ..... $99,999,999.00
<br />C(A) HEAVY GRADING..............................................................................................................
<br />$99,999,999.00
<br />D(A) HIGHWAY OR RAILROAD BRIDGE OVER WATER..........................................................
<br />$99,999,999.00
<br />D(B) HIGHWAY OR RAILROAD BRIDGE OVER HIGHWAY .....................................................
<br />$99,999,999.00
<br />D(C) HWY/RR BRIDGE REQ RR TRACK PROTECTION.........................................................
<br />$99,999,999.00
<br />E(C) BRIDGE DECK OVERLAY AND MINOR BRIDGE REPAIR.................. .......................
<br />...... $10,000,000.00
<br />E(E) SMALL STRUCTURES AND DRAINAGE ITEMS..............................................................
<br />$10,000,000.00
<br />E(F) SURFACE MASONRY AND MISCELLANEOUS CONCRETE ...........................................
<br />$99,999,999.00
<br />E(H) DEEP SEWER AND/OR EXCAVATION..............................................................................
<br />$99,999,999.00
<br />E(R) ASPHALT PAVEMENT MILLING.......................................................................................
<br />$99,999,999.00
<br />E(T) DEMOLITION......................................................................................................................
<br />$99,999,999.00
<br />COMMISSIONER
<br />rule FMM 2w%ft IA3 t sv6
<br />
|