Laserfiche WebLink
5/12/2025 9:1437AM <br />Quote To: <br />Phone: <br />Fax: <br />PROPOSAL <br />PREMIUM SERVICES <br />712 Richmond Street <br />Elkhart, ]IN 46516 <br />Contact: Rob Becker <br />Phone: <br />Fax: <br />South Bend Waste Water <br />Attn: Chip Enos <br />(574)370-0827 <br />574-264-0196 <br />574-266-5392 <br />Job Name: <br />Date of Plans: <br />HCSS #: <br />Revision Date: <br />Date: <br />R&R Damaged Trench Drain <br />N/A <br />6555 <br />N/A <br />5/12/25 <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />10 <br />Mobilization/Demobilization <br />1.00 <br />LS <br />20 <br />Remove Damaged Trench Drain, 3 Sections <br />10.00 <br />LF <br />30 <br />Remove Adjacent Damaged Sidewalk Panel <br />25.00 <br />SF <br />40 <br />Install New Trench Drain, 3 Sections <br />10.00 <br />LF <br />50 <br />1 New Sidewalk Panel <br />25.00 <br />SF <br />GRAND TOTAL 8,025.00 <br />NOTES: <br />1) Permits, bond, fees, inspection, testing, layout, licenses and engineering by others. <br />2) Proposal based on project completion by 6/30/25. <br />3) Proposal valid for 14 days. <br />4) Proposal includes: removal of 3 sections of damaged trench drain and surrounding concrete, plus removal of adjacent 5'x5' <br />panel of sidewalk; install new channel drain sections in concrete; reuse existing grates; form & pour new panel of sidewalk. <br />5) Proposal based on all items & quantities listed above. Prime contractor cannot vary items, quantities or pricing without first <br />consulting Premium Services (Estimator or Owner). <br />6) Proposal does NOT include any site specific safety training. Additional charges will apply if required. <br />7) Project duration including concrete cure time: up to 5 business days. <br />8) Proposal includes concrete washout containers and cleanup of site when complete. <br />9) Work to be completed during normal business hours, M-F 7:00am-4:00pm. Work hours could vary depending on concrete <br />delivery availability. <br />Page 1 of 1 <br />