My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Storm Drain and Sidewalk Repair - TX Concrete LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Quotations & Proposals
>
Award Quote - Storm Drain and Sidewalk Repair - TX Concrete LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:38:45 PM
Creation date
7/8/2025 1:15:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENVIRONMENTAL SERVICES <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Theresa Heffner, Clerk of the Board of Public Works <br />FROM: Chip Enos, Superintendent V - Wastewater <br />SUBJECT: Storm Drain and Sidewalk repair. <br />Quote Award <br />DATE: 7/2025 <br />The Division of Wastewater recommends the Board of Public Works approval of a Quote Award for <br />the Storm Drain and Sidewalk Replacement project to TX Concrete LLC as the lowest responsive, <br />responsible bidder. <br />Description of Project: <br />The East Headworks high bay garage entrance trench drain failed and requires repair and <br />replacement. In addition, minor concrete sidewalk replacement work is necessary to correct settling <br />and deficiencies in the existing sidewalk parallel to the drain. This work is necessary to avoid <br />stormwater running into the maintenance garage at the Headworks building and to prevent further <br />collapse from impeding lift truck from travelling into and out of the garage. <br />The Division of Wastewater received simple quotes for the subject work from three contractors for <br />the subject work. The quotations submitted by each of the contractors were determined to be <br />complete quotes and ranked as follows: <br />BASE BID — Storm Drain and Sidewalk Replacement Project <br />Vendor <br />Qty <br />Unit <br />Base Bid <br />Amount <br />1. TX Concrete LLC <br />1 <br />Lump Sum <br />$1525.75 <br />2. John Ward Concrete <br />1 <br />Lump Sum <br />$3180.00 <br />3. Premium Services <br />1 <br />Lump Sum <br />$8025.00 <br />Recommended Action: <br />The Division of Wastewater recommends that the Board of Public Works award the subject <br />quotation work to TX Concrete LLC for the Base Bid amount of $1525.75 as the lowest, responsive, <br />responsible bidder. <br />Funding: Sewage Works — Wastewater Operations Account 641-06-605-514-436001. <br />Contact name: Chip Enos (Ext. 5789) at the Division of Wastewater or Kimberly Thompson, <br />Director of the Division of Wastewater (Ext. 5969) for questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.